复杂机械非韵律流线调度周期优化

Ihor Ivaneiko, Yurii Oleksiv
{"title":"复杂机械非韵律流线调度周期优化","authors":"Ihor Ivaneiko, Yurii Oleksiv","doi":"10.23939/jtbp2022.02.075","DOIUrl":null,"url":null,"abstract":"The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM). An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs. A typical matrix model is used to compare the period of work execution. The calculation formulas are given for determining the execution time on the ID, the deployment period of the flow-line, the brigade, and the building. There is a new method of optimizing the flow-line deployment period with the parallel use of complex mechanized machines proposed in the article. This method shortens the construction period.","PeriodicalId":369033,"journal":{"name":"Theory and Building Practice","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"OPTIMIZATION OF DEPLOYMENT PERIODS OF NON-RHYTHMIC FLOW-LINES BY COMPLEX MECHANIZED MACHINES\",\"authors\":\"Ihor Ivaneiko, Yurii Oleksiv\",\"doi\":\"10.23939/jtbp2022.02.075\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM). An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs. A typical matrix model is used to compare the period of work execution. The calculation formulas are given for determining the execution time on the ID, the deployment period of the flow-line, the brigade, and the building. There is a new method of optimizing the flow-line deployment period with the parallel use of complex mechanized machines proposed in the article. This method shortens the construction period.\",\"PeriodicalId\":369033,\"journal\":{\"name\":\"Theory and Building Practice\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Theory and Building Practice\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23939/jtbp2022.02.075\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Theory and Building Practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23939/jtbp2022.02.075","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出利用复杂机械化机床(CMM),根据工作执行周期,对具有非节奏流线的工序进行平衡。关键路径法计算的流线部署周期和非关键工程停工时间的增加,要求开发优化方法来缩短工期。我们提出了一个假设,以平衡工作节奏,由于工作量的再分配在相互依赖的划分(ID)之间的cmm。采用典型的矩阵模型来比较工作执行周期。给出了确定ID执行时间、流线部署周期、大队部署周期、建筑物部署周期的计算公式。本文提出了一种复杂机械并联使用的优化流线调度周期的新方法。这种方法缩短了施工周期。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
OPTIMIZATION OF DEPLOYMENT PERIODS OF NON-RHYTHMIC FLOW-LINES BY COMPLEX MECHANIZED MACHINES
The article proposes to balance processes with non-rhythmic flow-lines according to the period of work execution with the use of complex mechanized machines (CMM). An increase in the period of deployment in the flow-line and downtime of non-critical works calculated by the Critical Path Method requires the development of optimization methods to reduce the construction period. We proposed a hypothesis to equalize work rhythms due to the redistribution of work volumes on interdependent divisions (ID) between CMMs. A typical matrix model is used to compare the period of work execution. The calculation formulas are given for determining the execution time on the ID, the deployment period of the flow-line, the brigade, and the building. There is a new method of optimizing the flow-line deployment period with the parallel use of complex mechanized machines proposed in the article. This method shortens the construction period.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
INJECTION OF CRACKS IN A RC BEAM WITH EPOXY RESIN USING THE GRAVITY FLOW METHOD OVER-STABILIZED BITUMEN EMULSIONS MADE FROM EMULSIFIERS FOR SLOW-SETTING EMULSIONS METHOD OF ARRANGEMENT OF INTERNAL THERMAL INSULATION OF EXTERNAL PROTECTIVE STRUCTURES OF THE ROOM STUDY OF FINE-GRAINED FIBER CONCRETE CRACKING RESISTANCE FROM THE POINT OF VIEW OF DESTRUCTION MECHANICS CONCRETE ON QUARTZITE AGGREGATES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1