{"title":"风电配电网角度约束主动管理","authors":"L. Ochoa, Douglas H. Wilson","doi":"10.1109/ISGTEUROPE.2010.5638966","DOIUrl":null,"url":null,"abstract":"Large volumes of wind generation capacity are expected to connect to distribution networks in the coming years. The traditional ‘fit and forget’ approach where all technical limitations are satisfied in any credible operational scenario has significantly reduced the ability of certain networks to integrate more generation capacity as the extra costs are not viable for most wind farm developers. In this context, it is envisaged that the true potential of distribution networks to accommodate large renewable generation capacities will only be realised by applying active network management schemes. Here, it is proposed the innovative use of synchrophasor technology to actively manage wind power generation output in congested distribution networks, resulting in the connection of more capacity and, hence, the delivery of more energy as opposed to the 'fit and forget' approach. This is achieved by applying an angle-based constraint that is determined according to the network characteristics (i.e., a proxy for thermal limits, voltage limits, etc.) and using minimal communication. Results from a radial test feeder considering two wind farms demonstrate the effectiveness of the technique in exporting more energy, although at expense of smaller capacity factors, whilst keeping the system secure.","PeriodicalId":267185,"journal":{"name":"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2010-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"37","resultStr":"{\"title\":\"Angle constraint active management of distribution networks with wind power\",\"authors\":\"L. Ochoa, Douglas H. Wilson\",\"doi\":\"10.1109/ISGTEUROPE.2010.5638966\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Large volumes of wind generation capacity are expected to connect to distribution networks in the coming years. The traditional ‘fit and forget’ approach where all technical limitations are satisfied in any credible operational scenario has significantly reduced the ability of certain networks to integrate more generation capacity as the extra costs are not viable for most wind farm developers. In this context, it is envisaged that the true potential of distribution networks to accommodate large renewable generation capacities will only be realised by applying active network management schemes. Here, it is proposed the innovative use of synchrophasor technology to actively manage wind power generation output in congested distribution networks, resulting in the connection of more capacity and, hence, the delivery of more energy as opposed to the 'fit and forget' approach. This is achieved by applying an angle-based constraint that is determined according to the network characteristics (i.e., a proxy for thermal limits, voltage limits, etc.) and using minimal communication. Results from a radial test feeder considering two wind farms demonstrate the effectiveness of the technique in exporting more energy, although at expense of smaller capacity factors, whilst keeping the system secure.\",\"PeriodicalId\":267185,\"journal\":{\"name\":\"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"37\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEUROPE.2010.5638966\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEUROPE.2010.5638966","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 37

摘要

未来几年,预计将有大量的风力发电能力连接到配电网。传统的“适应和忘记”方法在任何可靠的操作场景中都满足所有技术限制,这大大降低了某些网络整合更多发电容量的能力,因为额外的成本对大多数风电场开发商来说是不可行的。在这种情况下,可以设想,只有通过应用主动网络管理方案,才能实现配电网络容纳大型可再生能源发电能力的真正潜力。在这里,我们提出了创新地使用同步相量技术来积极管理拥挤的配电网络中的风力发电输出,从而连接更多的容量,从而提供更多的能量,而不是“适应和忘记”的方法。这是通过应用基于角度的约束来实现的,该约束是根据网络特性确定的(例如,热限制、电压限制等的代理),并使用最少的通信。考虑两个风电场的径向馈线测试结果表明,该技术在输出更多能量方面是有效的,尽管以较小的容量因素为代价,同时保持系统安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Angle constraint active management of distribution networks with wind power
Large volumes of wind generation capacity are expected to connect to distribution networks in the coming years. The traditional ‘fit and forget’ approach where all technical limitations are satisfied in any credible operational scenario has significantly reduced the ability of certain networks to integrate more generation capacity as the extra costs are not viable for most wind farm developers. In this context, it is envisaged that the true potential of distribution networks to accommodate large renewable generation capacities will only be realised by applying active network management schemes. Here, it is proposed the innovative use of synchrophasor technology to actively manage wind power generation output in congested distribution networks, resulting in the connection of more capacity and, hence, the delivery of more energy as opposed to the 'fit and forget' approach. This is achieved by applying an angle-based constraint that is determined according to the network characteristics (i.e., a proxy for thermal limits, voltage limits, etc.) and using minimal communication. Results from a radial test feeder considering two wind farms demonstrate the effectiveness of the technique in exporting more energy, although at expense of smaller capacity factors, whilst keeping the system secure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
IEEE DEIS and Smart Grid: How to fit in Benchmarking set for domestic smart grid management Smart distribution protection using current-only directional overcurrent relay Operating conditions forecasting for monitoring and control of electric power systems Active distribution network — Demonstration project ADINE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1