AMI元件安装采用现场作业技术

P. Iwaniuk, J. Sztukowski, M. Schwann
{"title":"AMI元件安装采用现场作业技术","authors":"P. Iwaniuk, J. Sztukowski, M. Schwann","doi":"10.1109/ICOLIM.2014.6934356","DOIUrl":null,"url":null,"abstract":"Basic guidelines for the preparation of a technical work for the IEEE Installation of AMI equipment, which in this paper are Advanced Metering Infrastructure devices in MV/LV pole substations, using live working, is a new technology developed and used in Poland, performed only by ENERGAOPERA TOR SA due to AMI project realization. In order to achieve the task already existing live working technology related to overhead MV distribution lines using the lift with isolation arm and the technology of live working on LV devices has been used. Work related with installation of devices mentioned above is a process, which has a few steps. In the first step, which had to be done before live working is selection of overhead current transformers (CT), installation of LV measuring balancing cabinet and wires in protection tubes on supporting structures of the MV/LV pole substation. The next step is to insulate the work zone for both the MV and LV level, which starts part of live working task. What needs to be done next is mounting CTs on cable. The installation of CT could be done in two ways: after turning off the LV receiver circuits or with using the insulated shunt. The next step is connection of voltage wires in LV balancing measuring cabinet. The final step is to remove insulation of work zone after checking proper execution of the task. The paper also describes problems that were faced in process of development of live working technology. During execution of the tasks it occurred that there was a problem with loosening transformer terminal screws of one of the manufacturers, commonly used in Poland, while using conventional insulated spanner. The maneuvers using available tools were not possible due to very small distance between transformer's LV bushings. The solution was found in developing new insulated spanner which would meet the requirements of live working technology and enable executing the task. There was also a need to develop a new insulation sheet for LV bushings of transformer.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Using live working technology in the installation of AMI elements\",\"authors\":\"P. Iwaniuk, J. Sztukowski, M. Schwann\",\"doi\":\"10.1109/ICOLIM.2014.6934356\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Basic guidelines for the preparation of a technical work for the IEEE Installation of AMI equipment, which in this paper are Advanced Metering Infrastructure devices in MV/LV pole substations, using live working, is a new technology developed and used in Poland, performed only by ENERGAOPERA TOR SA due to AMI project realization. In order to achieve the task already existing live working technology related to overhead MV distribution lines using the lift with isolation arm and the technology of live working on LV devices has been used. Work related with installation of devices mentioned above is a process, which has a few steps. In the first step, which had to be done before live working is selection of overhead current transformers (CT), installation of LV measuring balancing cabinet and wires in protection tubes on supporting structures of the MV/LV pole substation. The next step is to insulate the work zone for both the MV and LV level, which starts part of live working task. What needs to be done next is mounting CTs on cable. The installation of CT could be done in two ways: after turning off the LV receiver circuits or with using the insulated shunt. The next step is connection of voltage wires in LV balancing measuring cabinet. The final step is to remove insulation of work zone after checking proper execution of the task. The paper also describes problems that were faced in process of development of live working technology. During execution of the tasks it occurred that there was a problem with loosening transformer terminal screws of one of the manufacturers, commonly used in Poland, while using conventional insulated spanner. The maneuvers using available tools were not possible due to very small distance between transformer's LV bushings. The solution was found in developing new insulated spanner which would meet the requirements of live working technology and enable executing the task. There was also a need to develop a new insulation sheet for LV bushings of transformer.\",\"PeriodicalId\":238060,\"journal\":{\"name\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICOLIM.2014.6934356\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934356","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

AMI设备的IEEE安装技术工作准备的基本指南,在本文中,AMI设备是中压/低压电极变电站采用带电工作的高级计量基础设施设备,是波兰开发和使用的一项新技术,由于AMI项目的实现,仅由ENERGAOPERA TOR SA执行。为了实现该任务,采用了已有的架空中压配电线路带隔离臂升降机带电作业技术和低压设备带电作业技术。与上述设备的安装有关的工作是一个过程,它有几个步骤。第一步是选择架空电流互感器(CT),安装低压测量平衡柜,在中压/低压变电所支架上安装保护管中的导线。下一步是对工作区域进行中压和低压绝缘,这就开始了部分带电工作任务。接下来需要做的是在电缆上安装ct。CT的安装有两种方式:关闭低压接收器电路或使用绝缘分流器。下一步是低压平衡测量柜中电压导线的连接。最后一步是在检查任务是否正确执行后拆除工作区域的绝缘。本文还介绍了现场作业技术在发展过程中所面临的问题。在执行任务时,发生了一个问题,即在使用传统绝缘扳手时,松动了波兰常用的一家制造商的变压器端子螺钉。由于变压器低压套管之间的距离很小,使用可用工具进行机动是不可能的。解决方案是开发一种新的绝缘扳手,既能满足带电作业技术的要求,又能执行任务。还需要开发一种新的变压器低压套管绝缘片。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Using live working technology in the installation of AMI elements
Basic guidelines for the preparation of a technical work for the IEEE Installation of AMI equipment, which in this paper are Advanced Metering Infrastructure devices in MV/LV pole substations, using live working, is a new technology developed and used in Poland, performed only by ENERGAOPERA TOR SA due to AMI project realization. In order to achieve the task already existing live working technology related to overhead MV distribution lines using the lift with isolation arm and the technology of live working on LV devices has been used. Work related with installation of devices mentioned above is a process, which has a few steps. In the first step, which had to be done before live working is selection of overhead current transformers (CT), installation of LV measuring balancing cabinet and wires in protection tubes on supporting structures of the MV/LV pole substation. The next step is to insulate the work zone for both the MV and LV level, which starts part of live working task. What needs to be done next is mounting CTs on cable. The installation of CT could be done in two ways: after turning off the LV receiver circuits or with using the insulated shunt. The next step is connection of voltage wires in LV balancing measuring cabinet. The final step is to remove insulation of work zone after checking proper execution of the task. The paper also describes problems that were faced in process of development of live working technology. During execution of the tasks it occurred that there was a problem with loosening transformer terminal screws of one of the manufacturers, commonly used in Poland, while using conventional insulated spanner. The maneuvers using available tools were not possible due to very small distance between transformer's LV bushings. The solution was found in developing new insulated spanner which would meet the requirements of live working technology and enable executing the task. There was also a need to develop a new insulation sheet for LV bushings of transformer.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
RTE POLICY on H V-B Live Working Live rehabilitation of 400kV OHL Mintia-Sibiu Assessment of ageing ACSR conductors and LineVue™ inspection device For a better understanding of Live Working Bird protector-related issues on medium voltage overhead networks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1