Riezky Tazkia Pratiwi, Yeri Sutopo
{"title":"UJI MODEL HIDROLIK FISIK (UMH-FISIK) PELIMPAH BENDUNGAN CIBEET DI KABUPATEN BOGOR","authors":"Riezky Tazkia Pratiwi, Yeri Sutopo","doi":"10.53866/jimi.v2i2.71","DOIUrl":null,"url":null,"abstract":"Among the vital components of a dam is the spillway structure. Therefore, the building requires testing of physical hydraulic models, one of which is carried out at the Water Hydraulics and Geotechnical Center laboratory. This physical hydraulic model test study aims to analyze the hydraulic behavior of the dam spillway, mainly the discharge curve and flow elevation, average flow velocity, flow direction pattern, and hydrostatic pressure. This study uses a physical hydraulic model (modeling), which is a research method that focuses on 3-dimensional physical modeling and using the initial design from the consultant (series 0) by modeling some of the core parts of the dam such as spillway structures, dam body structures, launch channels, energy dampers, some of the contours of the river upstream, and some of the contours of the river downstream. The research instrument used were: Thompson discharge measuring instrument, level meter as a means of predicting water level elevation, current meter velocity measuring instrument, floating object as a research aid, a piezometer to determine hydrostatic pressure. The results showed that the spillway capacity could drain the PMF return period discharge (QPMF = 2091,75 m3/s) with the available guard height of 1,25 m, meeting the planning criteria of 0,75 m. At the Q2th and Q25th discharges, there is no hydraulic jump in the energy reducer and leads directly to the transition channel. In contrast, at the Q100th and Q1000th discharges, a hydraulic jump occurs in the energy reducer. The flow velocity, downstream of the spillway, especially on the left side of the guide wall, was recorded at a relatively high velocity, allowing turbulence to occur. The flow direction pattern that occurs upstream of the reservoir is reasonably even towards the spillway, and there is no crossflow. There is negative pressure at the piezometer point P5 with a 2-year return discharge of -0,25 N/m2, a 25-year return discharge of -0,25 N/m2, and a 100-year return discharge of -0,15 N/m2, which is still within the safe limits and does not exceed the allowable provisions, namely -1.00 m (for pairs) and -4.00 m (for concrete).","PeriodicalId":414894,"journal":{"name":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53866/jimi.v2i2.71","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

泄洪道结构是大坝的重要组成部分之一。因此,该建筑需要对物理水力模型进行测试,其中一项是在水力学和岩土工程中心实验室进行的。本物理水工模型试验研究旨在分析大坝溢洪道的水力特性,主要分析泄洪曲线及流高程、平均流速、流向型和静水压力。本研究采用的是物理水力模型(建模),这是一种以三维物理建模为重点,利用咨询公司(0系列)的初步设计,对大坝的一些核心部位,如溢洪道结构、坝体结构、下水通道、能量阻尼器、上游部分河流等高线、下游部分河流等高线进行建模的研究方法。研究使用的仪器有:汤姆逊流量测量仪、预测水位高程的液位计、流速测量仪、辅助研究的漂浮物、测定静水压力的压力计。结果表明:在有效防护高度为1.25 m的情况下,泄洪道泄洪能力可排干PMF回流期流量(QPMF = 2091 75 m3/s),满足0.75 m的规划标准;在第二次和第二次出水时,减速器内没有液压跳变,直接进入过渡通道。相反,在第q100次和第q1000次排放时,减速器中出现了液压跳变。在溢洪道下游,特别是导流墙左侧,流速被记录在一个相对较高的速度,允许湍流发生。水库上游流向向溢洪道方向较为均匀,不存在横流。压力计点P5存在负压,2年回泄量为-0,25 N/m2, 25年回泄量为-0,25 N/m2, 100年回泄量为-0,15 N/m2,仍在安全范围内,不超过允许的规定,即-1.00 m(双)和-4.00 m(混凝土)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
UJI MODEL HIDROLIK FISIK (UMH-FISIK) PELIMPAH BENDUNGAN CIBEET DI KABUPATEN BOGOR
Among the vital components of a dam is the spillway structure. Therefore, the building requires testing of physical hydraulic models, one of which is carried out at the Water Hydraulics and Geotechnical Center laboratory. This physical hydraulic model test study aims to analyze the hydraulic behavior of the dam spillway, mainly the discharge curve and flow elevation, average flow velocity, flow direction pattern, and hydrostatic pressure. This study uses a physical hydraulic model (modeling), which is a research method that focuses on 3-dimensional physical modeling and using the initial design from the consultant (series 0) by modeling some of the core parts of the dam such as spillway structures, dam body structures, launch channels, energy dampers, some of the contours of the river upstream, and some of the contours of the river downstream. The research instrument used were: Thompson discharge measuring instrument, level meter as a means of predicting water level elevation, current meter velocity measuring instrument, floating object as a research aid, a piezometer to determine hydrostatic pressure. The results showed that the spillway capacity could drain the PMF return period discharge (QPMF = 2091,75 m3/s) with the available guard height of 1,25 m, meeting the planning criteria of 0,75 m. At the Q2th and Q25th discharges, there is no hydraulic jump in the energy reducer and leads directly to the transition channel. In contrast, at the Q100th and Q1000th discharges, a hydraulic jump occurs in the energy reducer. The flow velocity, downstream of the spillway, especially on the left side of the guide wall, was recorded at a relatively high velocity, allowing turbulence to occur. The flow direction pattern that occurs upstream of the reservoir is reasonably even towards the spillway, and there is no crossflow. There is negative pressure at the piezometer point P5 with a 2-year return discharge of -0,25 N/m2, a 25-year return discharge of -0,25 N/m2, and a 100-year return discharge of -0,15 N/m2, which is still within the safe limits and does not exceed the allowable provisions, namely -1.00 m (for pairs) and -4.00 m (for concrete).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH ELECTRONIC WORD OF MOUTH (E-WOM) TERHADAP LOYALITAS KONSUMEN DENGAN KEPUTUSAN PEMBELIAN SEBAGAI VARIABEL MEDIASI (Studi Kasus Pada Konsumen Wanita Monokrom Store Yogyakarta) ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT HAK MEWARIS ANAK ANGKAT DI INDONESIA DITINJAU DARI HUKUM PERDATA DAN HUKUM ISLAM FENOMENA POLITIK IDENTITAS DALAM PEMILU DI INDONESIA ANALISIS STRUKTUR KOLOM PADA GEDUNG PARKIR RUMAH SAKIT DI SEMARANG
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1