{"title":"印度尼西亚低成本住房项目中建筑垃圾的详细描述","authors":"Nurlaelah Nurlaelah, Arman Jayady","doi":"10.31098/lomr.v1i1.861","DOIUrl":null,"url":null,"abstract":"\nDevelopers construct low-cost housing specifically for the low-income demographic. While the number of people interested in this sort of home is growing in Indonesia, in practice, there is sometimes a delay in the development process due to waste. The goal of this research is to identify and describe the waste that occurs during the construction of low-cost dwellings. Field observations and interviews with 17 contractors working on four low-cost housing projects were used to gather data. The findings of the analysis demonstrate that various wastes arise throughout the construction process' flow, including waste Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting in each job, all of which stymie the development process. This study was not conducted at the level of the developer or material supplier, but rather at the project site, specifically on every job in the process of constructing a consumer's home. This study uses seven forms of waste that exist in a succession of manufacturing processes, namely Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting, which are rarely employed in construction projects.\n","PeriodicalId":247331,"journal":{"name":"Logistic and Operation Management Research (LOMR)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The Detailed Description of Construction Waste in Low-Cost Housing Projects in Indonesia\",\"authors\":\"Nurlaelah Nurlaelah, Arman Jayady\",\"doi\":\"10.31098/lomr.v1i1.861\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nDevelopers construct low-cost housing specifically for the low-income demographic. While the number of people interested in this sort of home is growing in Indonesia, in practice, there is sometimes a delay in the development process due to waste. The goal of this research is to identify and describe the waste that occurs during the construction of low-cost dwellings. Field observations and interviews with 17 contractors working on four low-cost housing projects were used to gather data. The findings of the analysis demonstrate that various wastes arise throughout the construction process' flow, including waste Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting in each job, all of which stymie the development process. This study was not conducted at the level of the developer or material supplier, but rather at the project site, specifically on every job in the process of constructing a consumer's home. This study uses seven forms of waste that exist in a succession of manufacturing processes, namely Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting, which are rarely employed in construction projects.\\n\",\"PeriodicalId\":247331,\"journal\":{\"name\":\"Logistic and Operation Management Research (LOMR)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Logistic and Operation Management Research (LOMR)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31098/lomr.v1i1.861\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Logistic and Operation Management Research (LOMR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31098/lomr.v1i1.861","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

开发商专门为低收入人群建造廉价住房。虽然对这种住宅感兴趣的人在印度尼西亚越来越多,但在实践中,有时由于浪费而导致开发过程延迟。这项研究的目的是确定和描述在建造低成本住宅期间发生的浪费。利用实地观察和对从事4个低成本住房项目的17个承包商的访谈来收集数据。分析的结果表明,各种各样的浪费出现在整个施工过程的流程中,包括浪费生产过剩,库存,缺陷,运动,运输,加工和等待在每个工作中,所有这些阻碍了开发过程。这项研究不是在开发商或材料供应商的层面上进行的,而是在项目现场进行的,特别是在建造消费者住宅过程中的每一项工作。本研究使用了在一系列制造过程中存在的七种形式的浪费,即过剩生产、库存、缺陷、运动、运输、加工和等待,这些浪费在建筑项目中很少使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Detailed Description of Construction Waste in Low-Cost Housing Projects in Indonesia
Developers construct low-cost housing specifically for the low-income demographic. While the number of people interested in this sort of home is growing in Indonesia, in practice, there is sometimes a delay in the development process due to waste. The goal of this research is to identify and describe the waste that occurs during the construction of low-cost dwellings. Field observations and interviews with 17 contractors working on four low-cost housing projects were used to gather data. The findings of the analysis demonstrate that various wastes arise throughout the construction process' flow, including waste Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting in each job, all of which stymie the development process. This study was not conducted at the level of the developer or material supplier, but rather at the project site, specifically on every job in the process of constructing a consumer's home. This study uses seven forms of waste that exist in a succession of manufacturing processes, namely Overproduction, Inventory, Defect, Motion, Transportation, Processing, and Waiting, which are rarely employed in construction projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Topology Study of Milking Machine Based Parametric Modeling Supply Chain Management Practice and Competitive Advantage: Systematic Literature Review A narrative study on Third-Party Logistics practices and optimization measures by the Supply Chain Managers of e-commerce industries in Nepal Contribution of Lean Manufacturing on environmental performance in Moroccan Industry Real-Time Prototype Electricity Monitoring and Forecasting System based on Wemos D1 R1 ESP8266 and IoT
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1