{"title":"作为建筑项目精益工具的价值流映射","authors":"Murat Gunduz, Ayman Naser","doi":"10.18178/ijscer.8.1.69-74","DOIUrl":null,"url":null,"abstract":"Based on lean thinking which developed from the Toyota industry, seek to wastes elimination, increase the value added to the product from customer point of view and reduce lead time are the main contributes in manufacturing industrial environment. Some adaptations have been applied in construction industry by using a Value Stream Mapping as a lean construction tool. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage. Moreover, a cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. Therefore, this paper aims to propose improvements in the construction industry process using Value Stream Mapping. Therefore, the research methodology adopted was the illustrative case study. The results suggest that the construction of underground pipelines process lead time could be potentially reduced by 30.7 % and cost reduction of 20.8 % between current and future states. ","PeriodicalId":101411,"journal":{"name":"International journal of structural and civil engineering research","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Value Stream Mapping as a Lean Tool for Construction Projects\",\"authors\":\"Murat Gunduz, Ayman Naser\",\"doi\":\"10.18178/ijscer.8.1.69-74\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on lean thinking which developed from the Toyota industry, seek to wastes elimination, increase the value added to the product from customer point of view and reduce lead time are the main contributes in manufacturing industrial environment. Some adaptations have been applied in construction industry by using a Value Stream Mapping as a lean construction tool. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage. Moreover, a cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. Therefore, this paper aims to propose improvements in the construction industry process using Value Stream Mapping. Therefore, the research methodology adopted was the illustrative case study. The results suggest that the construction of underground pipelines process lead time could be potentially reduced by 30.7 % and cost reduction of 20.8 % between current and future states. \",\"PeriodicalId\":101411,\"journal\":{\"name\":\"International journal of structural and civil engineering research\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International journal of structural and civil engineering research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18178/ijscer.8.1.69-74\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International journal of structural and civil engineering research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18178/ijscer.8.1.69-74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

以丰田工业发展起来的精益思想为基础,从顾客的角度出发,寻求消除浪费,提高产品附加值,缩短交货时间是制造业工业环境的主要贡献。一些适应已经应用于建筑业通过使用价值流图作为精益建设工具。VSM被用于减少非增值活动的高比例和每个施工阶段的时间浪费。在此基础上,建立了当前状态和未来状态下地下管道建设成本估算模型。因此,本文旨在利用价值流图对建筑业流程提出改进建议。因此,本文采用的研究方法是说明性案例研究。结果表明,在目前和未来的状态下,地下管道的建设过程交货时间可能会减少30.7%,成本可能会减少20.8%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Value Stream Mapping as a Lean Tool for Construction Projects
Based on lean thinking which developed from the Toyota industry, seek to wastes elimination, increase the value added to the product from customer point of view and reduce lead time are the main contributes in manufacturing industrial environment. Some adaptations have been applied in construction industry by using a Value Stream Mapping as a lean construction tool. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage. Moreover, a cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. Therefore, this paper aims to propose improvements in the construction industry process using Value Stream Mapping. Therefore, the research methodology adopted was the illustrative case study. The results suggest that the construction of underground pipelines process lead time could be potentially reduced by 30.7 % and cost reduction of 20.8 % between current and future states. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Energy Efficiency: Use of BIM in Energy Analysis for Multi-family Residences Rainfall Runoff and Flood Simulations for Hurricane Impacts on Woonasquatucket River, USA. An Experimental and Numerical Study of the Load Distribution Effect on Composite Slab Shear Resistance Linear and Nonlinear Buckling Analysis of Castellated Beams Natural Volcanic Pozzolan-and Granulated Blast Furnace Slag-Based Alkali-Activated Repair Mortar
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1