{"title":"考虑配电网的运行","authors":"S. Abapour, Sayyad Nojavan, K. Zare, M. Abapour","doi":"10.1109/SGC.2014.7090853","DOIUrl":null,"url":null,"abstract":"This paper proposes a new paradigm for distribution system operation with considering Demand Response Programs (DRP). In this paper is focused to study the effect of DRP on total cost function, where the time-based demand response programs have been modeled and consequently its influence on load profile has been discussed. This paper presents a cost function that minimizes energy cost of Distribution Network Operator (DNO). The proposed objective function is determined based on optimal power flow and with considering the technical constraints. The results of DRP method are compared without them. The analysis was carried out successfully considering a 33- bus distribution network. This paper uses GAMS software to solve the short-term operation problem on case study.","PeriodicalId":341696,"journal":{"name":"2014 Smart Grid Conference (SGC)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operation of Distribution Network with Considering\",\"authors\":\"S. Abapour, Sayyad Nojavan, K. Zare, M. Abapour\",\"doi\":\"10.1109/SGC.2014.7090853\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a new paradigm for distribution system operation with considering Demand Response Programs (DRP). In this paper is focused to study the effect of DRP on total cost function, where the time-based demand response programs have been modeled and consequently its influence on load profile has been discussed. This paper presents a cost function that minimizes energy cost of Distribution Network Operator (DNO). The proposed objective function is determined based on optimal power flow and with considering the technical constraints. The results of DRP method are compared without them. The analysis was carried out successfully considering a 33- bus distribution network. This paper uses GAMS software to solve the short-term operation problem on case study.\",\"PeriodicalId\":341696,\"journal\":{\"name\":\"2014 Smart Grid Conference (SGC)\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Smart Grid Conference (SGC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SGC.2014.7090853\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Smart Grid Conference (SGC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SGC.2014.7090853","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一种考虑需求响应方案的配电系统运行新模式。本文重点研究了DRP对总成本函数的影响,对基于时间的需求响应方案进行了建模,并讨论了DRP对负荷分布的影响。提出了一种使配电网运营商能源成本最小的成本函数。所提出的目标函数是基于最优潮流并考虑技术约束条件确定的。并对不含它们的DRP法的结果进行了比较。以一个33总线配电网为例,成功地进行了分析。本文通过实例分析,利用GAMS软件解决了短期运行问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Operation of Distribution Network with Considering
This paper proposes a new paradigm for distribution system operation with considering Demand Response Programs (DRP). In this paper is focused to study the effect of DRP on total cost function, where the time-based demand response programs have been modeled and consequently its influence on load profile has been discussed. This paper presents a cost function that minimizes energy cost of Distribution Network Operator (DNO). The proposed objective function is determined based on optimal power flow and with considering the technical constraints. The results of DRP method are compared without them. The analysis was carried out successfully considering a 33- bus distribution network. This paper uses GAMS software to solve the short-term operation problem on case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Probabilistic optimal power dispatch in multi-microgrids using heuristic algorithms Investigating the impacts of wind power contribution on the short-term frequency performance Application of active management in operation of distribution network using NSGA II Simulating and analysis of cyber attacks on a BLPC network Impact of forecast accuracy on energy management of a virtual power plant
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1