{"title":"长江口新横沙填海工程对盐度影响的数值模拟研究","authors":"H. Lyu, Junjie Bian, Yu-Duo Hao, Runli Tao","doi":"10.1117/12.2667692","DOIUrl":null,"url":null,"abstract":"The impacts of the Xinhengsha Reclamation Project on saltwater intrusion and freshwater resources in the Yangtze Estuary is simulated by Ecom-si. It is found that the salinity in the North Branch decreases slightly, the salinity in the North Channel and South Channel decreases obviously after the implementation of the Xinhengsha Reclamation Project. In addition, the implementation of the Xinhengsha Reclamation Project has a significant impact on the water intaking of the three reservoirs (Dongfengxisha Reservoir, Chenhang Reservoir, Qingcaosha Reservoir). In a spring-neap tide cycle, after the implementation of the Xinhengsha Reclamation Project, Dongfengxisha Reservoir is shortened from a maximum of 7 days before the project to 6 days, Chenhang Reservoir is shortened from 3.5 days to 0 days, Qingcaosha Reservoir is shortened from 4 days to 2.5 days. The above research results show that the implementation of the Xinhengsha Reclamation Project is beneficial to the water intaking of the three reservoirs.","PeriodicalId":345723,"journal":{"name":"Fifth International Conference on Computer Information Science and Artificial Intelligence","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Numerical simulation study on impacts of the Xinhengsha reclamation project on salinity in the Yangtze Estuary\",\"authors\":\"H. Lyu, Junjie Bian, Yu-Duo Hao, Runli Tao\",\"doi\":\"10.1117/12.2667692\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The impacts of the Xinhengsha Reclamation Project on saltwater intrusion and freshwater resources in the Yangtze Estuary is simulated by Ecom-si. It is found that the salinity in the North Branch decreases slightly, the salinity in the North Channel and South Channel decreases obviously after the implementation of the Xinhengsha Reclamation Project. In addition, the implementation of the Xinhengsha Reclamation Project has a significant impact on the water intaking of the three reservoirs (Dongfengxisha Reservoir, Chenhang Reservoir, Qingcaosha Reservoir). In a spring-neap tide cycle, after the implementation of the Xinhengsha Reclamation Project, Dongfengxisha Reservoir is shortened from a maximum of 7 days before the project to 6 days, Chenhang Reservoir is shortened from 3.5 days to 0 days, Qingcaosha Reservoir is shortened from 4 days to 2.5 days. The above research results show that the implementation of the Xinhengsha Reclamation Project is beneficial to the water intaking of the three reservoirs.\",\"PeriodicalId\":345723,\"journal\":{\"name\":\"Fifth International Conference on Computer Information Science and Artificial Intelligence\",\"volume\":\"140 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fifth International Conference on Computer Information Science and Artificial Intelligence\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2667692\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fifth International Conference on Computer Information Science and Artificial Intelligence","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2667692","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Numerical simulation study on impacts of the Xinhengsha reclamation project on salinity in the Yangtze Estuary
The impacts of the Xinhengsha Reclamation Project on saltwater intrusion and freshwater resources in the Yangtze Estuary is simulated by Ecom-si. It is found that the salinity in the North Branch decreases slightly, the salinity in the North Channel and South Channel decreases obviously after the implementation of the Xinhengsha Reclamation Project. In addition, the implementation of the Xinhengsha Reclamation Project has a significant impact on the water intaking of the three reservoirs (Dongfengxisha Reservoir, Chenhang Reservoir, Qingcaosha Reservoir). In a spring-neap tide cycle, after the implementation of the Xinhengsha Reclamation Project, Dongfengxisha Reservoir is shortened from a maximum of 7 days before the project to 6 days, Chenhang Reservoir is shortened from 3.5 days to 0 days, Qingcaosha Reservoir is shortened from 4 days to 2.5 days. The above research results show that the implementation of the Xinhengsha Reclamation Project is beneficial to the water intaking of the three reservoirs.