{"title":"长距离输电线路大规模高集散风电集成测试系统的功能识别","authors":"Jiabing Hu, Yunhe Hou, Feng Liu, Y. Chi, S. Feng, Haiyan Tang, G. Song, Xiaoming Yuan","doi":"10.1109/ISGTEUROPE.2014.7028838","DOIUrl":null,"url":null,"abstract":"Large-scale, highly-concentrated wind power integrated into grids through long transmission lines will bring significant challenges to power system operation during steady-state and dynamic processes. Tremendous research has been conducted in this critical area. However, few, if any available testing systems have been established to meet the requirements of the research on different time-scales. The objective of this paper is to identify the functionality requirements of the testing systems for the comprehensive studies, which covers different time-scale problems of power systems. For this purpose, the realistic Gansu power grids in China and wind farms in Jiuquan area are selected. As a typical power grid with large-scale highly-concentrated wind power integration by long-distance transmissions, the characteristics of the selected wind farms and power grid are discussed first. Two simplified systems are constructed associated with the major characteristics. The critical functionality requirements of the testing systems for different research purposes, i.e., system planning, operation, control, and protection, are identified. As the first step, this paper scopes the key requirements and, ultimately, a complete testing system is expected.","PeriodicalId":299515,"journal":{"name":"IEEE PES Innovative Smart Grid Technologies, Europe","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Functionality identification for the testing systems with large-scale highly-concentrated wind power integration by long-distance transmission lines\",\"authors\":\"Jiabing Hu, Yunhe Hou, Feng Liu, Y. Chi, S. Feng, Haiyan Tang, G. Song, Xiaoming Yuan\",\"doi\":\"10.1109/ISGTEUROPE.2014.7028838\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Large-scale, highly-concentrated wind power integrated into grids through long transmission lines will bring significant challenges to power system operation during steady-state and dynamic processes. Tremendous research has been conducted in this critical area. However, few, if any available testing systems have been established to meet the requirements of the research on different time-scales. The objective of this paper is to identify the functionality requirements of the testing systems for the comprehensive studies, which covers different time-scale problems of power systems. For this purpose, the realistic Gansu power grids in China and wind farms in Jiuquan area are selected. As a typical power grid with large-scale highly-concentrated wind power integration by long-distance transmissions, the characteristics of the selected wind farms and power grid are discussed first. Two simplified systems are constructed associated with the major characteristics. The critical functionality requirements of the testing systems for different research purposes, i.e., system planning, operation, control, and protection, are identified. As the first step, this paper scopes the key requirements and, ultimately, a complete testing system is expected.\",\"PeriodicalId\":299515,\"journal\":{\"name\":\"IEEE PES Innovative Smart Grid Technologies, Europe\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES Innovative Smart Grid Technologies, Europe\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEUROPE.2014.7028838\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES Innovative Smart Grid Technologies, Europe","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEUROPE.2014.7028838","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

大规模、高度集中的风电通过长输电线并网,将给电力系统稳态和动态运行带来重大挑战。在这个关键领域进行了大量的研究。然而,满足不同时间尺度研究要求的测试系统很少,如果有的话。本文的目的是确定测试系统的功能需求,以进行全面的研究,涵盖电力系统的不同时间尺度问题。为此,选取了中国现实的甘肃电网和酒泉地区的风电场。作为一个典型的大规模高集中式长距离输电并网的电网,本文首先讨论了所选风电场和电网的特点。根据主要特征构造了两个简化系统。为不同的研究目的,即系统规划、操作、控制和保护,确定了测试系统的关键功能需求。作为第一步,本文确定了关键需求,并最终期望建立一个完整的测试系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Functionality identification for the testing systems with large-scale highly-concentrated wind power integration by long-distance transmission lines
Large-scale, highly-concentrated wind power integrated into grids through long transmission lines will bring significant challenges to power system operation during steady-state and dynamic processes. Tremendous research has been conducted in this critical area. However, few, if any available testing systems have been established to meet the requirements of the research on different time-scales. The objective of this paper is to identify the functionality requirements of the testing systems for the comprehensive studies, which covers different time-scale problems of power systems. For this purpose, the realistic Gansu power grids in China and wind farms in Jiuquan area are selected. As a typical power grid with large-scale highly-concentrated wind power integration by long-distance transmissions, the characteristics of the selected wind farms and power grid are discussed first. Two simplified systems are constructed associated with the major characteristics. The critical functionality requirements of the testing systems for different research purposes, i.e., system planning, operation, control, and protection, are identified. As the first step, this paper scopes the key requirements and, ultimately, a complete testing system is expected.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Discrete elastic residential load response under variable pricing schemes Challenges in utilisation of demand side response for operating reserve provision Managing energy in time and space in smart grids using TRIANA Optimal scheduling of electrical vehicle charging under two types of steering signals A design-driven approach for developing new products for smart grid households
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1