{"title":"利用超声波测井数据优化套管切割和拉拔作业效率","authors":"Tonje Winther, G. O. Palacio, Amit Govil","doi":"10.2118/205431-ms","DOIUrl":null,"url":null,"abstract":"\n Thousands of wells will enter the plug and abandonment (P&A) phase across the Norwegian Continental Shelf (NCS), either for permanent well abandonment or section abandonment with subsequent sidetracks. In the medium and long term, more wells will be added to follow the same path as exploration, drilling, and production continues.\n The cost of abandonment operations demands improvement of how P&A operations are performed. A critical, and often time-consuming operation, of well or section abandonment is to cut and pull (C&P) some of the casing strings. Uncertainties about the status of the annular contents and the material within it, such as settled solids, contaminated cement, or well geometry might pose restraints that could hinder the C&P efficiency. The uncertainties may cause operations to deviate from the plan, increasing the time and the costs required.\n New-generation ultrasonic tools, in combination with sonic tools, provide information about the annulus material with a detailed map of the axial and azimuthal variations of the annulus contents. The geometric position of the inner pipe can be determined relative to the outer casing or borehole using advanced measurements. Logging with ultrasonic and sonic tools is a noninvasive method that can increase the efficiency of C&P operations.\n In this paper we discuss three case studies of wells ranging from 2 to 40 years old. Some of the wells have reached the end of their economic life and are now ready for permanent plug and abandonment (PP&A) or slot recovery. Each case is unique with different casing sizes being retrieved, along with varied annulus contents observed from ultrasonic and sonic log data. The innovative use of the data interpretation with advanced workflows decreased uncertainties about the annulus contents and enabled following an informed C&P strategy. In all three cases, the casing sections were retrieved without difficulties from the recommended depths of the analysis. Casing milling was performed in intervals where C&P was not supported by the data analysis.","PeriodicalId":277521,"journal":{"name":"Day 2 Wed, September 08, 2021","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Casing Cut and Pull Operations Efficiency Using Ultrasonic Logging Data\",\"authors\":\"Tonje Winther, G. O. Palacio, Amit Govil\",\"doi\":\"10.2118/205431-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Thousands of wells will enter the plug and abandonment (P&A) phase across the Norwegian Continental Shelf (NCS), either for permanent well abandonment or section abandonment with subsequent sidetracks. In the medium and long term, more wells will be added to follow the same path as exploration, drilling, and production continues.\\n The cost of abandonment operations demands improvement of how P&A operations are performed. A critical, and often time-consuming operation, of well or section abandonment is to cut and pull (C&P) some of the casing strings. Uncertainties about the status of the annular contents and the material within it, such as settled solids, contaminated cement, or well geometry might pose restraints that could hinder the C&P efficiency. The uncertainties may cause operations to deviate from the plan, increasing the time and the costs required.\\n New-generation ultrasonic tools, in combination with sonic tools, provide information about the annulus material with a detailed map of the axial and azimuthal variations of the annulus contents. The geometric position of the inner pipe can be determined relative to the outer casing or borehole using advanced measurements. Logging with ultrasonic and sonic tools is a noninvasive method that can increase the efficiency of C&P operations.\\n In this paper we discuss three case studies of wells ranging from 2 to 40 years old. Some of the wells have reached the end of their economic life and are now ready for permanent plug and abandonment (PP&A) or slot recovery. Each case is unique with different casing sizes being retrieved, along with varied annulus contents observed from ultrasonic and sonic log data. The innovative use of the data interpretation with advanced workflows decreased uncertainties about the annulus contents and enabled following an informed C&P strategy. In all three cases, the casing sections were retrieved without difficulties from the recommended depths of the analysis. Casing milling was performed in intervals where C&P was not supported by the data analysis.\",\"PeriodicalId\":277521,\"journal\":{\"name\":\"Day 2 Wed, September 08, 2021\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, September 08, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205431-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 08, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205431-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

挪威大陆架(NCS)的数千口井将进入封井弃井(P&A)阶段,要么是永久弃井,要么是部分弃井以及随后的支线弃井。从中期和长期来看,随着勘探、钻井和生产的继续,将会有更多的井加入。弃井作业的成本要求改进封堵弃井作业的执行方式。弃井或弃井段的一个关键且通常耗时的作业是切割和拉起(C&P)一些套管柱。环空内容物及其内部物质状态的不确定性,如固体沉降、受污染的水泥或井的几何形状,可能会阻碍C&P效率。这些不确定性可能导致作业偏离计划,增加所需的时间和成本。新一代超声工具,结合声波工具,提供环空物质的信息,并详细绘制环空内容物的轴向和方位角变化图。利用先进的测量方法,可以确定内管相对于外套管或井眼的几何位置。超声波测井工具是一种非侵入式的测井方法,可以提高C&P作业的效率。本文讨论了3口井的案例研究,井龄从2年到40年不等。一些井已经达到了其经济寿命,现在可以进行永久性的封井和弃井(PP&A)或槽位回收。每种情况都是独特的,回收的套管尺寸不同,超声波和声波测井数据观察到的环空内容物也不同。数据解释的创新应用与先进的工作流程减少了环空内容的不确定性,并实现了明智的C&P策略。在这三种情况下,从推荐的分析深度中取出套管段都没有遇到任何困难。在数据分析不支持C&P的井段进行了套管磨铣。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimizing Casing Cut and Pull Operations Efficiency Using Ultrasonic Logging Data
Thousands of wells will enter the plug and abandonment (P&A) phase across the Norwegian Continental Shelf (NCS), either for permanent well abandonment or section abandonment with subsequent sidetracks. In the medium and long term, more wells will be added to follow the same path as exploration, drilling, and production continues. The cost of abandonment operations demands improvement of how P&A operations are performed. A critical, and often time-consuming operation, of well or section abandonment is to cut and pull (C&P) some of the casing strings. Uncertainties about the status of the annular contents and the material within it, such as settled solids, contaminated cement, or well geometry might pose restraints that could hinder the C&P efficiency. The uncertainties may cause operations to deviate from the plan, increasing the time and the costs required. New-generation ultrasonic tools, in combination with sonic tools, provide information about the annulus material with a detailed map of the axial and azimuthal variations of the annulus contents. The geometric position of the inner pipe can be determined relative to the outer casing or borehole using advanced measurements. Logging with ultrasonic and sonic tools is a noninvasive method that can increase the efficiency of C&P operations. In this paper we discuss three case studies of wells ranging from 2 to 40 years old. Some of the wells have reached the end of their economic life and are now ready for permanent plug and abandonment (PP&A) or slot recovery. Each case is unique with different casing sizes being retrieved, along with varied annulus contents observed from ultrasonic and sonic log data. The innovative use of the data interpretation with advanced workflows decreased uncertainties about the annulus contents and enabled following an informed C&P strategy. In all three cases, the casing sections were retrieved without difficulties from the recommended depths of the analysis. Casing milling was performed in intervals where C&P was not supported by the data analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of Long Endurance UAS for Top-Down Methane Emission Measurements of Oil and Gas Facilities in an Offshore Environment Application of Laser and Plasma for Thermal Assisted Drilling in Carbonated Formations Feasibility of Repurposing Offshore Decommissioned Gas Rigs into Fish Farms Development of API 11D1 and API 19AC Validation Grade V0 Barrier-Qualified Gravel Pack System for Troll Phase 3 Big-Bore, High-Rate Gas Completions on the Norwegian Continental Shelf Initiatives in UK Offshore Decommissioning Following the Wood Review: Applicability for Decommissioning in Norway
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1