{"title":"矿山生产系统规划中与地面有关问题的核算","authors":"V. Kazakidis, M. Scoble","doi":"10.1142/S0950609802000823","DOIUrl":null,"url":null,"abstract":"Ground-related problems represent a significant source of operating risk and justify particular attention in proactive mine planning and design. This paper presents a new approach to quantify the impact of such problems in underground hardrock mining and considers the links between mine planning and ground-related problems. A classification of the various types of potential problems is presented, based on a review of case studies and the surveillance of ground failures in several mines in Ontario, Canada. Despite serious efforts to advance the effectiveness of design in such underground mines, ground-related problems still cannot be totally avoided. A time-dependent internal risk model was established to quantify the impact of ground-related problems in mine production systems. Subjective probabilities provide the input for a reliability analysis, which derives the required input parameters for production simulation. Reliability analyses that are currently used to calculate the reliability of mine equipment were applied for the case of mine subsystems with ground-related problems. A cost impact model is presented that is dependent on the parameters determined in a reliability analysis.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"ACCOUNTING FOR GROUND-RELATED PROBLEMS IN MINE PRODUCTION SYSTEMS PLANNING\",\"authors\":\"V. Kazakidis, M. Scoble\",\"doi\":\"10.1142/S0950609802000823\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ground-related problems represent a significant source of operating risk and justify particular attention in proactive mine planning and design. This paper presents a new approach to quantify the impact of such problems in underground hardrock mining and considers the links between mine planning and ground-related problems. A classification of the various types of potential problems is presented, based on a review of case studies and the surveillance of ground failures in several mines in Ontario, Canada. Despite serious efforts to advance the effectiveness of design in such underground mines, ground-related problems still cannot be totally avoided. A time-dependent internal risk model was established to quantify the impact of ground-related problems in mine production systems. Subjective probabilities provide the input for a reliability analysis, which derives the required input parameters for production simulation. Reliability analyses that are currently used to calculate the reliability of mine equipment were applied for the case of mine subsystems with ground-related problems. A cost impact model is presented that is dependent on the parameters determined in a reliability analysis.\",\"PeriodicalId\":195550,\"journal\":{\"name\":\"Mineral Resources Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mineral Resources Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1142/S0950609802000823\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mineral Resources Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/S0950609802000823","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

与地面有关的问题是作业风险的一个重要来源,因此需要特别注意主动的矿山规划和设计。本文提出了一种量化地下硬岩开采中此类问题影响的新方法,并考虑了矿山规划与地面相关问题之间的联系。根据对加拿大安大略省几个矿山的案例研究和地面故障监测的审查,提出了各种类型潜在问题的分类。尽管在这类地下矿山中努力提高设计的有效性,但与地面有关的问题仍然不能完全避免。建立了一个随时间变化的内部风险模型,以量化与地面有关的问题对矿山生产系统的影响。主观概率为可靠性分析提供输入,从而导出生产模拟所需的输入参数。将目前用于矿山设备可靠性计算的可靠性分析方法应用于具有接地问题的矿山子系统。提出了一个依赖于可靠性分析中确定的参数的成本影响模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ACCOUNTING FOR GROUND-RELATED PROBLEMS IN MINE PRODUCTION SYSTEMS PLANNING
Ground-related problems represent a significant source of operating risk and justify particular attention in proactive mine planning and design. This paper presents a new approach to quantify the impact of such problems in underground hardrock mining and considers the links between mine planning and ground-related problems. A classification of the various types of potential problems is presented, based on a review of case studies and the surveillance of ground failures in several mines in Ontario, Canada. Despite serious efforts to advance the effectiveness of design in such underground mines, ground-related problems still cannot be totally avoided. A time-dependent internal risk model was established to quantify the impact of ground-related problems in mine production systems. Subjective probabilities provide the input for a reliability analysis, which derives the required input parameters for production simulation. Reliability analyses that are currently used to calculate the reliability of mine equipment were applied for the case of mine subsystems with ground-related problems. A cost impact model is presented that is dependent on the parameters determined in a reliability analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
SWOTS ANALYSIS OF GLOBAL MINING ENGINEERING EDUCATION A REVISED FORM OF THE BERGMARK-ROOS EQUATION FOR DESCRIBING THE GRAVITY FLOW OF BROKEN ROCK A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV MINING PRACTICE ASSESSING GLOBAL LAND REQUIREMENT FOR SURFACE COPPER MINING Modelling Failure Pattern of a Mining Truck with a Decision Tree Algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1