Paks核电站模拟器辅助仪表和控制系统翻新

J. S. Janosy
{"title":"Paks核电站模拟器辅助仪表和控制系统翻新","authors":"J. S. Janosy","doi":"10.1109/AMS.2007.94","DOIUrl":null,"url":null,"abstract":"Replacing the aging instrumentation and control system (I&C) in a nuclear power plant (NPP) is always a difficult task, even without the present energy-distribution disturbances in Europe and the more and more frequent plant-life-extension and power-up-rating projects. The NPP plant life-cycle tends to reach 50-60 years, while that of the I&C system is only 8-10 years. Not only the systems become obsolete: spare parts for the old system are practically nonexistent. Putting into operation reliable, thoroughly tested, verified and validated, approved by the authorities new systems could significantly increase the outage time of the units. However, about 90% of the work can be done off-line, by means of full scope replica simulators, and in the same time the operators become trained to these new systems, too. Taking this approach the refurbishment does not increase the outage time needed for refuelling and repair, at least not significantly. The paper describes this methodology in detail","PeriodicalId":198751,"journal":{"name":"First Asia International Conference on Modelling & Simulation (AMS'07)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Simulator-Aided Instrumentation and Control System Refurbishment at Paks Nuclear Power Plant\",\"authors\":\"J. S. Janosy\",\"doi\":\"10.1109/AMS.2007.94\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Replacing the aging instrumentation and control system (I&C) in a nuclear power plant (NPP) is always a difficult task, even without the present energy-distribution disturbances in Europe and the more and more frequent plant-life-extension and power-up-rating projects. The NPP plant life-cycle tends to reach 50-60 years, while that of the I&C system is only 8-10 years. Not only the systems become obsolete: spare parts for the old system are practically nonexistent. Putting into operation reliable, thoroughly tested, verified and validated, approved by the authorities new systems could significantly increase the outage time of the units. However, about 90% of the work can be done off-line, by means of full scope replica simulators, and in the same time the operators become trained to these new systems, too. Taking this approach the refurbishment does not increase the outage time needed for refuelling and repair, at least not significantly. The paper describes this methodology in detail\",\"PeriodicalId\":198751,\"journal\":{\"name\":\"First Asia International Conference on Modelling & Simulation (AMS'07)\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-03-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"First Asia International Conference on Modelling & Simulation (AMS'07)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AMS.2007.94\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"First Asia International Conference on Modelling & Simulation (AMS'07)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AMS.2007.94","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

即使没有目前欧洲能源分布的扰动和日益频繁的核电厂延寿和功率升级项目,更换老化的核电站仪表和控制系统(I&C)一直是一项艰巨的任务。核电厂的生命周期往往达到50-60年,而I&C系统的生命周期只有8-10年。不仅系统变得过时,旧系统的备件实际上也不存在。新系统投入运行可靠,经过全面测试,验证和验证,并得到当局批准,可以显着增加机组的停机时间。然而,大约90%的工作可以通过全范围复制模拟器离线完成,同时操作员也可以接受这些新系统的培训。采用这种方法,翻新不会增加换料和维修所需的停机时间,至少不会显著增加。本文详细介绍了该方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simulator-Aided Instrumentation and Control System Refurbishment at Paks Nuclear Power Plant
Replacing the aging instrumentation and control system (I&C) in a nuclear power plant (NPP) is always a difficult task, even without the present energy-distribution disturbances in Europe and the more and more frequent plant-life-extension and power-up-rating projects. The NPP plant life-cycle tends to reach 50-60 years, while that of the I&C system is only 8-10 years. Not only the systems become obsolete: spare parts for the old system are practically nonexistent. Putting into operation reliable, thoroughly tested, verified and validated, approved by the authorities new systems could significantly increase the outage time of the units. However, about 90% of the work can be done off-line, by means of full scope replica simulators, and in the same time the operators become trained to these new systems, too. Taking this approach the refurbishment does not increase the outage time needed for refuelling and repair, at least not significantly. The paper describes this methodology in detail
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practical Protocol Steganography: Hiding Data in IP Header Energy Efficient Expanding Ring Search On Verification of Communicating Finite State Machines Using Residual Languages High-Speed Real-Time Simulation Modified Line Search Method for Global Optimization
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1