Syarifil Anwar, Ahmadil Amin
{"title":"PENGARUH OPERASIONAL PLTD PADA BANDAR UDARA SYAMSUDIN NOOR BANJARBARU AKIBAT PEMUTUSAN TENAGA LISTRIK OLEH PT. PLN DITINJAU DARI SEGI EKONOMI","authors":"Syarifil Anwar, Ahmadil Amin","doi":"10.31602/AJST.V4I2.2041","DOIUrl":null,"url":null,"abstract":"With the growing age and increasingly sophisticated technology, it will automatically bring changes in human life. Which will also be more and more demands and needs that must be met by humans to balance these developments. One of them is human needs for electrical energy. To meet the increasing electricity needs and to prevent total power outages from occurring, Syamsudin Noor Banjarbaru Airport uses PLTD (Diesel Power Plant) as a power supply for the operation of Syamsudin Noor Airport. Payment of electricity bills at the Syamsudin Noor airport will increase by operating the PLTD at the time of termination of electricity by PT. (PLN). Every month the electricity account must be paid by Syamsudin Noor Airport, but if there is a power cut, the PLTD will operate, so that it will cause additional costs every month at Syamsudin Noor Airport. Additional fees at Syamsudin Noor Banjarbaru Airport in addition to paying electricity bills every month, plus the total operational cost of PLTD (diesel engine) of Rp.15,215,370 Keywords: PLTD (diesel engine), AC generator, total operational cost of PLTD (diesel engine).","PeriodicalId":127601,"journal":{"name":"AL ULUM: JURNAL SAINS DAN TEKNOLOGI","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AL ULUM: JURNAL SAINS DAN TEKNOLOGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31602/AJST.V4I2.2041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着年龄的增长和技术的日益成熟,它将自动给人类的生活带来变化。这也将是越来越多的需求和需要,人类必须满足,以平衡这些发展。其中之一是人类对电能的需求。为了满足日益增长的电力需求并防止发生全面停电,Syamsudin Noor Banjarbaru机场使用PLTD(柴油发电厂)作为Syamsudin Noor机场运营的电源。Syamsudin Noor机场的电费支付将通过在PT. (PLN)终止供电时运营PLTD而增加。每个月的电费必须由Syamsudin Noor机场支付,但如果停电,PLTD将运行,因此它将在Syamsudin Noor机场每月产生额外费用。Syamsudin Noor Banjarbaru机场除了每月支付电费之外的额外费用,加上PLTD(柴油发动机)的总运营成本为15,215,370卢比。关键词:PLTD(柴油发动机),交流发电机,PLTD(柴油发动机)的总运营成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PENGARUH OPERASIONAL PLTD PADA BANDAR UDARA SYAMSUDIN NOOR BANJARBARU AKIBAT PEMUTUSAN TENAGA LISTRIK OLEH PT. PLN DITINJAU DARI SEGI EKONOMI
With the growing age and increasingly sophisticated technology, it will automatically bring changes in human life. Which will also be more and more demands and needs that must be met by humans to balance these developments. One of them is human needs for electrical energy. To meet the increasing electricity needs and to prevent total power outages from occurring, Syamsudin Noor Banjarbaru Airport uses PLTD (Diesel Power Plant) as a power supply for the operation of Syamsudin Noor Airport. Payment of electricity bills at the Syamsudin Noor airport will increase by operating the PLTD at the time of termination of electricity by PT. (PLN). Every month the electricity account must be paid by Syamsudin Noor Airport, but if there is a power cut, the PLTD will operate, so that it will cause additional costs every month at Syamsudin Noor Airport. Additional fees at Syamsudin Noor Banjarbaru Airport in addition to paying electricity bills every month, plus the total operational cost of PLTD (diesel engine) of Rp.15,215,370 Keywords: PLTD (diesel engine), AC generator, total operational cost of PLTD (diesel engine).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANTIBACTERIAL ACTIVITY OF METHANOL EXTRACT FROM INGGILI FRUIT (Xylocarpus granatum) AGAINST Propionibacterium acnes AND Escherichia coli USING WELL DIFFUSION METHOD NPK CONCENTRATION IN LIQUID MAGGOT FERTILIZER MADE FROM DIFFERENT ORGANIC RESOURCES ANALYZED Front Matter Al Ulum: Journal Of Science And Technology Vol. 9, No. 3, December 2023 USER INTERFACE AND EXPERIENCE IMPLEMENTATION ANALYSIS ON THE MADRASAH ALIYAH RAUDATUL YATAMA INFORMATION SYSTEM BUSINESS FEASIBILITY ANALYSIS OF PATIN FISH ENLARGEMENT POND IN BANUA LAWAS VILLAGE, TABALONG REGENCY
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1