{"title":"接地系统的安全","authors":"T. Kremic","doi":"10.1109/INTLEC.1988.22395","DOIUrl":null,"url":null,"abstract":"Problems connected with the grounding of central offices are discussed, and solutions are offered. Several examples are considered, including the case when a high-resistance connection exists between the grounding conductor and the distribution frame because of improper termination or faulty crimping.<<ETX>>","PeriodicalId":169486,"journal":{"name":"10th International Telecommunications Energy Conference","volume":"1 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Safety of grounding systems\",\"authors\":\"T. Kremic\",\"doi\":\"10.1109/INTLEC.1988.22395\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Problems connected with the grounding of central offices are discussed, and solutions are offered. Several examples are considered, including the case when a high-resistance connection exists between the grounding conductor and the distribution frame because of improper termination or faulty crimping.<<ETX>>\",\"PeriodicalId\":169486,\"journal\":{\"name\":\"10th International Telecommunications Energy Conference\",\"volume\":\"1 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"10th International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1988.22395\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1988.22395","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Problems connected with the grounding of central offices are discussed, and solutions are offered. Several examples are considered, including the case when a high-resistance connection exists between the grounding conductor and the distribution frame because of improper termination or faulty crimping.<>