{"title":"限期约束网格服务可靠性建模与分析","authors":"D. P. Mahato, Ravi Shankar Singh","doi":"10.1109/WAINA.2018.00066","DOIUrl":null,"url":null,"abstract":"Reliability modeling and analysis of deadline-constrained grid computing system is a complex task. Additionally, a task must be completed within its given deadline. Therefore, deadline-miss failure is another type of failure which must be explained. This paper presents hierarchical model and analysis for the deadline-constrained grid service reliability.","PeriodicalId":296466,"journal":{"name":"2018 32nd International Conference on Advanced Information Networking and Applications Workshops (WAINA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Reliability Modeling and Analysis for Deadline-Constrained Grid Service\",\"authors\":\"D. P. Mahato, Ravi Shankar Singh\",\"doi\":\"10.1109/WAINA.2018.00066\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reliability modeling and analysis of deadline-constrained grid computing system is a complex task. Additionally, a task must be completed within its given deadline. Therefore, deadline-miss failure is another type of failure which must be explained. This paper presents hierarchical model and analysis for the deadline-constrained grid service reliability.\",\"PeriodicalId\":296466,\"journal\":{\"name\":\"2018 32nd International Conference on Advanced Information Networking and Applications Workshops (WAINA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 32nd International Conference on Advanced Information Networking and Applications Workshops (WAINA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WAINA.2018.00066\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 32nd International Conference on Advanced Information Networking and Applications Workshops (WAINA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WAINA.2018.00066","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reliability Modeling and Analysis for Deadline-Constrained Grid Service
Reliability modeling and analysis of deadline-constrained grid computing system is a complex task. Additionally, a task must be completed within its given deadline. Therefore, deadline-miss failure is another type of failure which must be explained. This paper presents hierarchical model and analysis for the deadline-constrained grid service reliability.