{"title":"PELATIHAN DAN PEMBANGUNAN HYBRIDISASI PLT MIKROHYDRO–PLT SOLAR POWER DI GEREJA KATOLIK ST.ANNA LEKKE KEC. SIMBUANG KABUPATEN TANA TORAJA","authors":"Aries Kamolan, Syahir Mahmud, Limbran Sampebatu","doi":"10.53363/bw.v2i1.66","DOIUrl":null,"url":null,"abstract":"Currently, people at Lekke Village use electricity supplied by Micro hydro Power Plant. The plant of this turbine is located at about 5-6 km from the village and operates only about 10-12 hours per day, from 06.00 PM in evening to 06.00 AM in the morning. The remote location of the micro hydro plant decreases the received voltage at the community. Besides, the unstable condition of turbine installed at Lekke Village resulted in the fluctuation of the output frequency and voltage. At dry season, the decrement of water flow makes the decrement of the supplied power from the micro hydro plant. While in rainy season, the turbine sometimes fail to operate properly because of garbage, dry leaves, etc. which fall into the river and blocked its flow. Due to this condition, the needs of electricity at Lekke Village are crucial and needs the installation of solar power to meet the community needs. This activity trains local people to have a basic ability on how to build hybrid power installation of turbine and solar power. For this purpose Pengabdian Kepada Masyarakat (PKM) Team from Enginering Faculty of Atmajaya Makassar University is funded by Dirjen Pendidikan Tinggi, Riset dan Teknologi Kementerian Pendidikan dan Kebudayaan through Kegiatan Bantuan Pendanaan Program Penelitian Kebijakan Merdeka Belajar Kampus Merdeka dan Pengabdian Masyarakat Berbasis Hasil Penelitian dan Purwarupa PTS Ditjen Diktiristek. This training provides 2 basic skills to local people: 1). How to install Solar Power to be used at Sound System and lighting in the St.Anna church; 2) How to build the control system for the hybridization of micro hydro power-solar power. This training conducts in 2 consecutive session which is training session and installation session. Training session provide basic knowledge of micro hydro power-solar power to the local people and at the installation session the local people together with the trainer work together to install the solar power at St. Anna Church. This activity installs 2X140 WP solar panel with capacity equal to 140 Watt. The solar panel supported by 2x60 Watt batteries. After the installation, the installed system at St.Anna Church able to work 24 hours, supply 70 Watt Sound System and activate 10 lighting points where each point needs 7 Watt. The hybrid installation equipped with a controller that gives ability to select the input power from micro hydro power or from solar power","PeriodicalId":236606,"journal":{"name":"Batara Wisnu : Indonesian Journal of Community Services","volume":"03 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Batara Wisnu : Indonesian Journal of Community Services","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53363/bw.v2i1.66","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
目前,勒克村的人们使用的是微型水力发电厂提供的电力。该涡轮机的工厂位于距离村庄约5-6公里处,每天仅运行约10-12小时,从晚上6点到早上6点。微型水电站的偏远位置降低了社区的接收电压。此外,安装在勒克村的汽轮机状态不稳定,导致输出频率和电压波动。在旱季,水流量的减少导致了微水电厂供电量的减少。而在雨季,水轮机有时会因为垃圾、干树叶等落入河中,阻塞水流而无法正常运转。由于这种情况,Lekke村的电力需求至关重要,需要安装太阳能来满足社区的需求。该活动培养了当地民众对如何搭建涡轮机和太阳能混合动力装置的基本能力。为此,来自Atmajaya Makassar大学工程学院的Pengabdian Kepada Masyarakat (PKM)团队由Dirjen Pendidikan Tinggi, Riset dan Teknologi Kementerian Pendidikan dan Kebudayaan通过Kegiatan Bantuan pendanan Program Penelitian Kebijakan Merdeka Belajar Kampus Merdeka dan Pengabdian Masyarakat Berbasis Hasil Penelitian dan Purwarupa PTS Ditjen Diktiristek资助。本次培训为当地人提供了两项基本技能:1)如何安装太阳能,用于圣安娜教堂的音响系统和照明;2)如何构建微型水电-太阳能混合发电的控制系统。本次培训分培训课和安装课两部分进行。培训课程向当地人提供微型水电太阳能发电的基本知识,在安装课程中,当地人与培训师一起在圣安娜教堂安装太阳能发电。此活动安装2X140 WP太阳能电池板,容量等于140瓦。太阳能电池板由2x60瓦电池支撑。安装后,圣安娜教堂安装的系统可以24小时工作,提供70瓦的音响系统,并激活10个照明点,每个照明点需要7瓦。混合装置配备了一个控制器,可以选择从微型水力发电或太阳能发电的输入功率
PELATIHAN DAN PEMBANGUNAN HYBRIDISASI PLT MIKROHYDRO–PLT SOLAR POWER DI GEREJA KATOLIK ST.ANNA LEKKE KEC. SIMBUANG KABUPATEN TANA TORAJA
Currently, people at Lekke Village use electricity supplied by Micro hydro Power Plant. The plant of this turbine is located at about 5-6 km from the village and operates only about 10-12 hours per day, from 06.00 PM in evening to 06.00 AM in the morning. The remote location of the micro hydro plant decreases the received voltage at the community. Besides, the unstable condition of turbine installed at Lekke Village resulted in the fluctuation of the output frequency and voltage. At dry season, the decrement of water flow makes the decrement of the supplied power from the micro hydro plant. While in rainy season, the turbine sometimes fail to operate properly because of garbage, dry leaves, etc. which fall into the river and blocked its flow. Due to this condition, the needs of electricity at Lekke Village are crucial and needs the installation of solar power to meet the community needs. This activity trains local people to have a basic ability on how to build hybrid power installation of turbine and solar power. For this purpose Pengabdian Kepada Masyarakat (PKM) Team from Enginering Faculty of Atmajaya Makassar University is funded by Dirjen Pendidikan Tinggi, Riset dan Teknologi Kementerian Pendidikan dan Kebudayaan through Kegiatan Bantuan Pendanaan Program Penelitian Kebijakan Merdeka Belajar Kampus Merdeka dan Pengabdian Masyarakat Berbasis Hasil Penelitian dan Purwarupa PTS Ditjen Diktiristek. This training provides 2 basic skills to local people: 1). How to install Solar Power to be used at Sound System and lighting in the St.Anna church; 2) How to build the control system for the hybridization of micro hydro power-solar power. This training conducts in 2 consecutive session which is training session and installation session. Training session provide basic knowledge of micro hydro power-solar power to the local people and at the installation session the local people together with the trainer work together to install the solar power at St. Anna Church. This activity installs 2X140 WP solar panel with capacity equal to 140 Watt. The solar panel supported by 2x60 Watt batteries. After the installation, the installed system at St.Anna Church able to work 24 hours, supply 70 Watt Sound System and activate 10 lighting points where each point needs 7 Watt. The hybrid installation equipped with a controller that gives ability to select the input power from micro hydro power or from solar power