{"title":"基于可靠性分析的高效分布式供电系统设计","authors":"K. Yotsumoto, S. Muroyama, S. Matsumura, H. Watanabe","doi":"10.1109/INTLEC.1988.22406","DOIUrl":null,"url":null,"abstract":"A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/.<<ETX>>","PeriodicalId":169486,"journal":{"name":"10th International Telecommunications Energy Conference","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":"{\"title\":\"Design for a highly efficient distributed power supply system based on reliability analysis\",\"authors\":\"K. Yotsumoto, S. Muroyama, S. Matsumura, H. Watanabe\",\"doi\":\"10.1109/INTLEC.1988.22406\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/.<<ETX>>\",\"PeriodicalId\":169486,\"journal\":{\"name\":\"10th International Telecommunications Energy Conference\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"10th International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1988.22406\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1988.22406","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design for a highly efficient distributed power supply system based on reliability analysis
A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/.<>