输电线路切换过程中超高压变电站同步电容器的评估

Augusto T. H. Bartz, Francis A. Moreno Vásquez
{"title":"输电线路切换过程中超高压变电站同步电容器的评估","authors":"Augusto T. H. Bartz, Francis A. Moreno Vásquez","doi":"10.1109/WCNPS56355.2022.9969754","DOIUrl":null,"url":null,"abstract":"This work assesses the behavior of synchronous condensers when connected to a substation busbar in front of switching of transmission lines. This evaluation is based on the active and reactive powers as well as the field current of the electrical machine. In order to do so, a double-bus single breaker with four switch disconnectors power substation arrangement is modeled in the software EMTP-RV. This power system is tested under transmission line disconnections and the results show the response of the excitation system under this kind of situation and the way the synchronous condensers can alleviate the load flow in the remaining transmission lines it is also demonstrated.","PeriodicalId":120276,"journal":{"name":"2022 Workshop on Communication Networks and Power Systems (WCNPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of Synchronous Condensers Connected to Extra-High Voltage Substations during Transmission Lines Switching\",\"authors\":\"Augusto T. H. Bartz, Francis A. Moreno Vásquez\",\"doi\":\"10.1109/WCNPS56355.2022.9969754\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work assesses the behavior of synchronous condensers when connected to a substation busbar in front of switching of transmission lines. This evaluation is based on the active and reactive powers as well as the field current of the electrical machine. In order to do so, a double-bus single breaker with four switch disconnectors power substation arrangement is modeled in the software EMTP-RV. This power system is tested under transmission line disconnections and the results show the response of the excitation system under this kind of situation and the way the synchronous condensers can alleviate the load flow in the remaining transmission lines it is also demonstrated.\",\"PeriodicalId\":120276,\"journal\":{\"name\":\"2022 Workshop on Communication Networks and Power Systems (WCNPS)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 Workshop on Communication Networks and Power Systems (WCNPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WCNPS56355.2022.9969754\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 Workshop on Communication Networks and Power Systems (WCNPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WCNPS56355.2022.9969754","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这项工作评估了同步电容器在输电线路切换前连接到变电站母线时的行为。这种评估是基于电机的有功和无功功率以及励磁电流。为此,在EMTP-RV软件中对一种双母线单断路器、四开关隔离器变电所布置进行了建模。该电力系统在输电线路断开的情况下进行了测试,结果显示了励磁系统在这种情况下的响应以及同步冷凝器对剩余输电线路的负荷流的缓解作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Assessment of Synchronous Condensers Connected to Extra-High Voltage Substations during Transmission Lines Switching
This work assesses the behavior of synchronous condensers when connected to a substation busbar in front of switching of transmission lines. This evaluation is based on the active and reactive powers as well as the field current of the electrical machine. In order to do so, a double-bus single breaker with four switch disconnectors power substation arrangement is modeled in the software EMTP-RV. This power system is tested under transmission line disconnections and the results show the response of the excitation system under this kind of situation and the way the synchronous condensers can alleviate the load flow in the remaining transmission lines it is also demonstrated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
On the effective length of transmission line grounding conductors and the validity of the point-source model in GPR responses Proposal of an Inverter-based DER Model on OpenDSS Under IEEE 1547–2018 Regulation Proof of concept of Fault Detection and Identification Framework applied in Power Converter based on Digital Twins Methodology for Impact Analysis of Electric Vehicles Charging Stations in Low Voltage Distribution Networks Statistical and Performance Analysis of Compressive Sensing in Solar Corona Tomography
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1