供应链管理与组织变革:摩洛哥某建筑公司分包后的活动整合

Abdelouahab Errida, Bouchra Lotfi, E. Semma
{"title":"供应链管理与组织变革:摩洛哥某建筑公司分包后的活动整合","authors":"Abdelouahab Errida, Bouchra Lotfi, E. Semma","doi":"10.1109/LOGISTIQUA.2017.7962883","DOIUrl":null,"url":null,"abstract":"In this paper, we try, on the one hand to describe the impact of an organizational change on supply chain management (SCM) in a Moroccan construction company, that decides to vertically integrate a technical activity instead of subcontracting it to specialized companies. On the other hand, we propose an approach that will help ensure a successful transition from the total subcontracting to the progressive integration of this activity. This approach consists of evaluating the requested works, identifying those to be carried out by internal human resources, selecting suppliers and finally planning change management actions.","PeriodicalId":310750,"journal":{"name":"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Supply chain management and organizational change: Integrating an activity after its subcontracting in a Moroccan construction company\",\"authors\":\"Abdelouahab Errida, Bouchra Lotfi, E. Semma\",\"doi\":\"10.1109/LOGISTIQUA.2017.7962883\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we try, on the one hand to describe the impact of an organizational change on supply chain management (SCM) in a Moroccan construction company, that decides to vertically integrate a technical activity instead of subcontracting it to specialized companies. On the other hand, we propose an approach that will help ensure a successful transition from the total subcontracting to the progressive integration of this activity. This approach consists of evaluating the requested works, identifying those to be carried out by internal human resources, selecting suppliers and finally planning change management actions.\",\"PeriodicalId\":310750,\"journal\":{\"name\":\"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-04-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/LOGISTIQUA.2017.7962883\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LOGISTIQUA.2017.7962883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在本文中,我们一方面试图描述组织变革对摩洛哥一家建筑公司供应链管理(SCM)的影响,该公司决定垂直整合一项技术活动,而不是将其分包给专门的公司。另一方面,我们提出了一种有助于确保从完全分包到逐步整合这一活动的成功过渡的方法。该方法包括评估所要求的工作,确定由内部人力资源进行的工作,选择供应商,最后规划变更管理行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Supply chain management and organizational change: Integrating an activity after its subcontracting in a Moroccan construction company
In this paper, we try, on the one hand to describe the impact of an organizational change on supply chain management (SCM) in a Moroccan construction company, that decides to vertically integrate a technical activity instead of subcontracting it to specialized companies. On the other hand, we propose an approach that will help ensure a successful transition from the total subcontracting to the progressive integration of this activity. This approach consists of evaluating the requested works, identifying those to be carried out by internal human resources, selecting suppliers and finally planning change management actions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Towards a simulation model of an outpatient chemotherapy unit Supply chain management and organizational change: Integrating an activity after its subcontracting in a Moroccan construction company Workload balancing in nurse scheduling problem models and discussion Spatial analysis of bus accidents in France Toward an agent-based framework for human resource management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1