应用程序开发以减少打孔表的生成时间

Jae Yup Kim, Bong Uk Nam, Hunhee Cho
{"title":"应用程序开发以减少打孔表的生成时间","authors":"Jae Yup Kim, Bong Uk Nam, Hunhee Cho","doi":"10.3311/ccc2019-029","DOIUrl":null,"url":null,"abstract":"With the recent improvement in the quality of life, more and more people are now demanding higher quality in terms of construction projects. Accordingly, construction techniques and construction control techniques have advanced. Recently, various construction project quality control techniques have been introduced. However, due to the non-optimized processes, it is difficult to commercialize these techniques. The biggest problem of the existing task process is ‘the duplicated input’. The ‘input at the site’, the first phase of the ‘duplicated input’, is entered by typing within the application. However, due to the characteristics of the tasks on a construction site, it takes a long time and thus is inappropriate. Second, ‘the input at the office’ is problematic as it requires manual input for each sentence. The first problem was improved by changing the on-site typing method to ‘input by item selection’. The second problem was improved by using ‘automatic sorting’ for the on-site input within the application. When the improved task process was implemented in the application, the working hours were reduced by about 18.4%. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application Development to Reduce Generation Time for Punch List\",\"authors\":\"Jae Yup Kim, Bong Uk Nam, Hunhee Cho\",\"doi\":\"10.3311/ccc2019-029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the recent improvement in the quality of life, more and more people are now demanding higher quality in terms of construction projects. Accordingly, construction techniques and construction control techniques have advanced. Recently, various construction project quality control techniques have been introduced. However, due to the non-optimized processes, it is difficult to commercialize these techniques. The biggest problem of the existing task process is ‘the duplicated input’. The ‘input at the site’, the first phase of the ‘duplicated input’, is entered by typing within the application. However, due to the characteristics of the tasks on a construction site, it takes a long time and thus is inappropriate. Second, ‘the input at the office’ is problematic as it requires manual input for each sentence. The first problem was improved by changing the on-site typing method to ‘input by item selection’. The second problem was improved by using ‘automatic sorting’ for the on-site input within the application. When the improved task process was implemented in the application, the working hours were reduced by about 18.4%. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.\",\"PeriodicalId\":231420,\"journal\":{\"name\":\"Proceedings of the Creative Construction Conference 2019\",\"volume\":\"66 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Creative Construction Conference 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ccc2019-029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着近年来人们生活质量的提高,越来越多的人对建筑工程的质量提出了更高的要求。相应的,施工技术和施工控制技术也有了进步。近年来,介绍了各种建筑工程质量控制技术。然而,由于工艺未经过优化,这些技术很难实现商业化。现有任务流程的最大问题是“重复输入”。“现场输入”是“重复输入”的第一阶段,通过在应用程序中输入来输入。但由于施工现场任务的特点,耗时较长,不适合使用。其次,“办公室输入”是有问题的,因为每句话都需要人工输入。第一个问题通过将现场输入方法改为“按项目选择输入”得到了改善。第二个问题通过在应用程序中对现场输入使用“自动排序”得到了改善。当在应用程序中实现改进的任务流程时,工作时间减少了约18.4%。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Application Development to Reduce Generation Time for Punch List
With the recent improvement in the quality of life, more and more people are now demanding higher quality in terms of construction projects. Accordingly, construction techniques and construction control techniques have advanced. Recently, various construction project quality control techniques have been introduced. However, due to the non-optimized processes, it is difficult to commercialize these techniques. The biggest problem of the existing task process is ‘the duplicated input’. The ‘input at the site’, the first phase of the ‘duplicated input’, is entered by typing within the application. However, due to the characteristics of the tasks on a construction site, it takes a long time and thus is inappropriate. Second, ‘the input at the office’ is problematic as it requires manual input for each sentence. The first problem was improved by changing the on-site typing method to ‘input by item selection’. The second problem was improved by using ‘automatic sorting’ for the on-site input within the application. When the improved task process was implemented in the application, the working hours were reduced by about 18.4%. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Input for Hybrid Simulation Modelling Construction Operations What are the Barriers and Drivers Toward BIM Adoption in Nigeria? Ontology Assisted Collaboration Sessions on 4D BIM A Balanced Scorecard for Assessing Automation in Construction Traceability for Built Assets: Proposed Framework for a Digital Record
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1