{"title":"供应风险管理与供应商选择,以管理EPC供应链中的供应风险","authors":"G. Micheli, E. Cagno, M. Zorzini","doi":"10.1108/01409170810913042","DOIUrl":null,"url":null,"abstract":"Purpose – The purpose of this paper is to understand whether a link between the use of supplier selection (SS) and supply risk management (SRM) exists and whether further contextual factors which lead to the use of SRM and of SS exist in the engineering, procurement and construction (EPC) sector.Design/methodology/approach – A multiple case study has been undertaken as an empirical analysis to answer a series of research questions. The data have been collected through structured interviews to corporate procurement directors of companies belonging to the Italian EPC sector and operating in an engineer‐to‐order fashion.Findings – The results of the research point out that supply risk can be managed through both SS and SRM. These two different approaches are used alternatively by the companies investigated under resource constraints. A further set of contextual factors leading to the use of SRM (project orientation in supply management, use of partnerships with suppliers, corporate standardisation), and a co...","PeriodicalId":325346,"journal":{"name":"Management Research News","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"78","resultStr":"{\"title\":\"Supply risk management vs supplier selection to manage the supply risk in the EPC supply chain\",\"authors\":\"G. Micheli, E. Cagno, M. Zorzini\",\"doi\":\"10.1108/01409170810913042\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose – The purpose of this paper is to understand whether a link between the use of supplier selection (SS) and supply risk management (SRM) exists and whether further contextual factors which lead to the use of SRM and of SS exist in the engineering, procurement and construction (EPC) sector.Design/methodology/approach – A multiple case study has been undertaken as an empirical analysis to answer a series of research questions. The data have been collected through structured interviews to corporate procurement directors of companies belonging to the Italian EPC sector and operating in an engineer‐to‐order fashion.Findings – The results of the research point out that supply risk can be managed through both SS and SRM. These two different approaches are used alternatively by the companies investigated under resource constraints. A further set of contextual factors leading to the use of SRM (project orientation in supply management, use of partnerships with suppliers, corporate standardisation), and a co...\",\"PeriodicalId\":325346,\"journal\":{\"name\":\"Management Research News\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-09-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"78\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Management Research News\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/01409170810913042\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Research News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/01409170810913042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Supply risk management vs supplier selection to manage the supply risk in the EPC supply chain
Purpose – The purpose of this paper is to understand whether a link between the use of supplier selection (SS) and supply risk management (SRM) exists and whether further contextual factors which lead to the use of SRM and of SS exist in the engineering, procurement and construction (EPC) sector.Design/methodology/approach – A multiple case study has been undertaken as an empirical analysis to answer a series of research questions. The data have been collected through structured interviews to corporate procurement directors of companies belonging to the Italian EPC sector and operating in an engineer‐to‐order fashion.Findings – The results of the research point out that supply risk can be managed through both SS and SRM. These two different approaches are used alternatively by the companies investigated under resource constraints. A further set of contextual factors leading to the use of SRM (project orientation in supply management, use of partnerships with suppliers, corporate standardisation), and a co...