{"title":"减少改变42英寸水管的影响","authors":"Ben Sebastian-Green","doi":"10.1680/hs2.65765.437","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reducing the impact of diverting a 42-inch water main\",\"authors\":\"Ben Sebastian-Green\",\"doi\":\"10.1680/hs2.65765.437\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":266260,\"journal\":{\"name\":\"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/hs2.65765.437\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/hs2.65765.437","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}