{"title":"Integrated design development of the Colne Valley Viaduct","authors":"Chris Patience, E. Jones","doi":"10.1680/hs2.65765.087","DOIUrl":"https://doi.org/10.1680/hs2.65765.087","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115009205","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
R. larkins, Claire Howarth, Hannah May, Hitesh Mistry
{"title":"Development of the Streethay Cutting design: from retained to open cut","authors":"R. larkins, Claire Howarth, Hannah May, Hitesh Mistry","doi":"10.1680/hs2.65765.401","DOIUrl":"https://doi.org/10.1680/hs2.65765.401","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125314273","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
J. Turner, C. Preston, Richard Winthrop, Ian Thatcher, Peter Swales, Jamie Finney
{"title":"Advances in engineering survey grid transformations for rail infrastructure","authors":"J. Turner, C. Preston, Richard Winthrop, Ian Thatcher, Peter Swales, Jamie Finney","doi":"10.1680/hs2.65765.461","DOIUrl":"https://doi.org/10.1680/hs2.65765.461","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130336512","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Mike Deevy, Jiajie Zhu, S. Downie, S. Padhani, P. Woodburn, Michael Boyd, Mark J Gilbey, Nicole Hoffman
{"title":"Innovative passive smoke control in Copthall Tunnel","authors":"Mike Deevy, Jiajie Zhu, S. Downie, S. Padhani, P. Woodburn, Michael Boyd, Mark J Gilbey, Nicole Hoffman","doi":"10.1680/hs2.65765.217","DOIUrl":"https://doi.org/10.1680/hs2.65765.217","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133328702","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Xavier Torelló, D. Hoerrle, H. Castellvi, George Doulkas, Tomasz Rogala
{"title":"Special segments design for cross passages and shaft passages","authors":"Xavier Torelló, D. Hoerrle, H. Castellvi, George Doulkas, Tomasz Rogala","doi":"10.1680/hs2.65765.181","DOIUrl":"https://doi.org/10.1680/hs2.65765.181","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127196250","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Design of Chiltern Tunnel South Portal","authors":"W. George, R. Browne, L. Canning, D. Carter","doi":"10.1680/hs2.65765.291","DOIUrl":"https://doi.org/10.1680/hs2.65765.291","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131534866","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
P. Woodburn, Mike Deevy, Ivy Wang, Jiajie Zhu, Michael Boyd, Nicole Hoffman
{"title":"Train fire spalling risk assessment","authors":"P. Woodburn, Mike Deevy, Ivy Wang, Jiajie Zhu, Michael Boyd, Nicole Hoffman","doi":"10.1680/hs2.65765.193","DOIUrl":"https://doi.org/10.1680/hs2.65765.193","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133354313","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Reducing the impact of diverting a 42-inch water main","authors":"Ben Sebastian-Green","doi":"10.1680/hs2.65765.437","DOIUrl":"https://doi.org/10.1680/hs2.65765.437","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130252504","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Grace Reid, L. Davis, Kim Quazi, Richard Jackson, Peter Evans, I. Lockwood
{"title":"HS2 interchange station: an exemplar project for integrating Safe by Design principles","authors":"Grace Reid, L. Davis, Kim Quazi, Richard Jackson, Peter Evans, I. Lockwood","doi":"10.1680/hs2.65765.003","DOIUrl":"https://doi.org/10.1680/hs2.65765.003","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130168650","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Chiltern Tunnel cross passage durability design – response to challenges","authors":"David Morgan, Yuan Le, Thomas Schultheis","doi":"10.1680/hs2.65765.305","DOIUrl":"https://doi.org/10.1680/hs2.65765.305","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122419685","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}