项目经理是否非正式地遵循项目管理的能力成熟度模型集成实践?

J. Iqbal, Muzafar Khan, N. Minhas
{"title":"项目经理是否非正式地遵循项目管理的能力成熟度模型集成实践?","authors":"J. Iqbal, Muzafar Khan, N. Minhas","doi":"10.18844/GJIT.V8I3.4048","DOIUrl":null,"url":null,"abstract":"Project planning is crucial for fruitful completion of a software development project. In case of a certified software development organisation, one can guess whether the software development projects are planned properly or not. But, what to do for a non-certified organisation? The objective of this study is to address this problem. For this purpose, a questionnaire survey has been conducted by involving experienced practitioners. The results show that several software development organisations follow Capability Maturity Model Integration) Project Planning-Process Area practices unofficially. Such organisations are potential candidate organisations for software process improvement initiatives, and would be cheap and safe for successful completion of a project. Keywords: CMMI, software project management, software process improvement, specific goals, specific practices, subpractices.","PeriodicalId":188272,"journal":{"name":"Global Journal of Information Technology: Emerging Technologies","volume":"05 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Are project managers informally following capability maturity model integration practices for project management?\",\"authors\":\"J. Iqbal, Muzafar Khan, N. Minhas\",\"doi\":\"10.18844/GJIT.V8I3.4048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project planning is crucial for fruitful completion of a software development project. In case of a certified software development organisation, one can guess whether the software development projects are planned properly or not. But, what to do for a non-certified organisation? The objective of this study is to address this problem. For this purpose, a questionnaire survey has been conducted by involving experienced practitioners. The results show that several software development organisations follow Capability Maturity Model Integration) Project Planning-Process Area practices unofficially. Such organisations are potential candidate organisations for software process improvement initiatives, and would be cheap and safe for successful completion of a project. Keywords: CMMI, software project management, software process improvement, specific goals, specific practices, subpractices.\",\"PeriodicalId\":188272,\"journal\":{\"name\":\"Global Journal of Information Technology: Emerging Technologies\",\"volume\":\"05 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Global Journal of Information Technology: Emerging Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18844/GJIT.V8I3.4048\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Information Technology: Emerging Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18844/GJIT.V8I3.4048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

项目计划对于有效地完成软件开发项目至关重要。如果是经过认证的软件开发机构,人们可以猜测软件开发项目是否计划得当。但是,对于非认证机构该怎么办呢?本研究的目的就是要解决这个问题。为此,我们邀请有经验的从业员进行问卷调查。结果表明,一些软件开发组织非正式地遵循能力成熟度模型(集成)项目计划-过程域实践。这样的组织是软件过程改进计划的潜在候选组织,并且对于成功完成项目来说是廉价和安全的。关键词:CMMI,软件项目管理,软件过程改进,特定目标,特定实践,子实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Are project managers informally following capability maturity model integration practices for project management?
Project planning is crucial for fruitful completion of a software development project. In case of a certified software development organisation, one can guess whether the software development projects are planned properly or not. But, what to do for a non-certified organisation? The objective of this study is to address this problem. For this purpose, a questionnaire survey has been conducted by involving experienced practitioners. The results show that several software development organisations follow Capability Maturity Model Integration) Project Planning-Process Area practices unofficially. Such organisations are potential candidate organisations for software process improvement initiatives, and would be cheap and safe for successful completion of a project. Keywords: CMMI, software project management, software process improvement, specific goals, specific practices, subpractices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Identity Goods Educational Technology with Relationship to the Quality Performance During the (COVID-19) Pandemic Deep Learning for Automatic Classification of Identification Documents Motivation for Fruitful Physics Learning Cloud Computing in Healthcare Industry: A Systematic Literature Review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1