{"title":"基于负荷预期指标损失的日、时负荷曲线关系公式","authors":"Yeonchan Lee, Ungjin Oh, Duy-Phuong N. Do, Jaeseok Choi, Hongseok Choi, J. Cha, D. Jeon","doi":"10.1109/PMAPS.2016.7764201","DOIUrl":null,"url":null,"abstract":"This paper develops a conversion function and method transforming from daily peak load curve used LOLED [days/year] to hourly load curve used LOLEH [hours/year] firstly. The indices can not only be conversed just arithmetically but also have different characteristics physically because of using their different load curves. The conversion function is formulated as variables of capacity and forced outage rate of generator, hourly load daily load factor and daily peak load yearly load factor, etc. Therefore, the conversion function (γ = φ(·)) can not be formulated in simple but in complex and difficult. In this study, therefore, the function is formulated as linear times of separated two functions. One is exponential formed conversion function of daily load factor. Another is formulated exponential typed conversion function of daily peak load yearly load factor. Furthermore, this paper presents algorithm and flow chart for conversing from LOLED [days/year] to LOLEH[hours/year]. The proposed conversion function is applied to sample system and actual KPS(Korea Power System) in 2015. The exponent coefficients of the conversion functions are assessed using proposed method. Finally, assessment errors using conversion function for case studies of sample system and actual system are evaluated to certify the firstly proposed method.","PeriodicalId":265474,"journal":{"name":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Relation formulation between daily and hourly load curve based loss of load expectation indices\",\"authors\":\"Yeonchan Lee, Ungjin Oh, Duy-Phuong N. Do, Jaeseok Choi, Hongseok Choi, J. Cha, D. Jeon\",\"doi\":\"10.1109/PMAPS.2016.7764201\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper develops a conversion function and method transforming from daily peak load curve used LOLED [days/year] to hourly load curve used LOLEH [hours/year] firstly. The indices can not only be conversed just arithmetically but also have different characteristics physically because of using their different load curves. The conversion function is formulated as variables of capacity and forced outage rate of generator, hourly load daily load factor and daily peak load yearly load factor, etc. Therefore, the conversion function (γ = φ(·)) can not be formulated in simple but in complex and difficult. In this study, therefore, the function is formulated as linear times of separated two functions. One is exponential formed conversion function of daily load factor. Another is formulated exponential typed conversion function of daily peak load yearly load factor. Furthermore, this paper presents algorithm and flow chart for conversing from LOLED [days/year] to LOLEH[hours/year]. The proposed conversion function is applied to sample system and actual KPS(Korea Power System) in 2015. The exponent coefficients of the conversion functions are assessed using proposed method. Finally, assessment errors using conversion function for case studies of sample system and actual system are evaluated to certify the firstly proposed method.\",\"PeriodicalId\":265474,\"journal\":{\"name\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PMAPS.2016.7764201\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS.2016.7764201","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文首先建立了将日峰值负荷曲线(lloled [days/year])转换为小时负荷曲线(lloleh [hours/year])的转换函数和方法。这些指标不仅可以在算术上进行转换,而且由于使用不同的负荷曲线而具有不同的物理特性。换算函数为发电机容量、强制停运率、小时负荷日负荷因子、日峰值负荷年负荷因子等变量。因此,转换函数(γ = φ(·))不能简单地表示,而是复杂而困难地表示。因此,在本研究中,函数被表示为分离的两个函数的线性乘。一种是日负荷系数指数型转换函数。另一种是建立日峰值负荷年负荷因子的指数型转换函数。此外,本文还给出了从LOLED(天/年)转换为LOLEH(小时/年)的算法和流程图。将所提出的转换函数应用于样本系统和2015年韩国电力系统的实际情况。利用该方法对转换函数的指数系数进行了评估。最后,利用转换函数对样本系统和实际系统进行了评估误差评估,验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Relation formulation between daily and hourly load curve based loss of load expectation indices
This paper develops a conversion function and method transforming from daily peak load curve used LOLED [days/year] to hourly load curve used LOLEH [hours/year] firstly. The indices can not only be conversed just arithmetically but also have different characteristics physically because of using their different load curves. The conversion function is formulated as variables of capacity and forced outage rate of generator, hourly load daily load factor and daily peak load yearly load factor, etc. Therefore, the conversion function (γ = φ(·)) can not be formulated in simple but in complex and difficult. In this study, therefore, the function is formulated as linear times of separated two functions. One is exponential formed conversion function of daily load factor. Another is formulated exponential typed conversion function of daily peak load yearly load factor. Furthermore, this paper presents algorithm and flow chart for conversing from LOLED [days/year] to LOLEH[hours/year]. The proposed conversion function is applied to sample system and actual KPS(Korea Power System) in 2015. The exponent coefficients of the conversion functions are assessed using proposed method. Finally, assessment errors using conversion function for case studies of sample system and actual system are evaluated to certify the firstly proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A performance and maintenance evaluation framework for wind turbines Transmission network expansion planning with stochastic multivariate load and wind modeling The anomalous data identification study of reactive power optimization system based on big data A resilient power system operation strategy considering presumed attacks The use of Markov chain method to determine spare transformer number with 3-criteria parameters
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1