利用电潜泵提高埃及西部沙漠成熟油田欠平衡射孔产量的有效利用:案例研究

M. Sayed, A. Sabaa, A. Samir, Mohamed Mokhtar, A. Medhat, A. El-Wakil
{"title":"利用电潜泵提高埃及西部沙漠成熟油田欠平衡射孔产量的有效利用:案例研究","authors":"M. Sayed, A. Sabaa, A. Samir, Mohamed Mokhtar, A. Medhat, A. El-Wakil","doi":"10.2523/iptc-22793-ea","DOIUrl":null,"url":null,"abstract":"\n Conventionally, the transition from completion to production often requires the well to be killed immediately after perforation is completed, thus exposing the formation to potentially damaging killing fluid. To obtain a perforation tunnel with maximum productivity, this transition requires an optimal clean-up and removal of the perforation damages.\n Underbalance perforation through Tubing Conveyed Perforating (TCP) system is one of the best practices to ensure less damage to the perforation tunnels (perforating skin) leading to increased well productivity. However, it is very challenging in cases of completions with Electrical Submersible Pump's (ESP) to maintain productivity with undamaged reservoir by preventing any contact between reservoir and completion fluid and achieve the above simultaneously with safe well control during ESP deployment. Otherwise, the alternative solution is to run TCP string in single run then kill the well after perforation in order to install the ESP completion.\n As a result of the increasing emphasis on reducing operating costs, maximizing well productivity, and minimizing wellbore clean-up time, an integrated solution was designed and successfully implemented for perforating artificially lifted wells in static underbalanced condition and installing ESP completion in single run without killing the well. It combines the use of TCP system equipped with automatic release gun hanger. TCP gun string has been set by Electric Line against the required intervals, then the ESP has been separately installed and the guns has been activated through an electronic firing head for a shoot-and-drop operation. The static underbalance condition has been created by the ESP thanks to the programmed delayed firing time. After this operation, the well has been directly lined up to production flowline with minimal wellbore clean-up time. The combination of static underbalanced perforation with deep penetration charges which is able to bypass invasion zone, can create a clean perforation tunnel, and significantly reduce the post-perforating damage by killing fluid, and finally maximize the well productivity. Despite the challenging reservoir conditions (Depth= 16,500 FT, Pressure=6250 Psi, Temperature= 285 deg. F, Porosity = 8%), the Productivity Index (PI) of the wells were three times compared to the offset wells.\n Five jobs have been performed by Agiba Petroleum Company, one of the main operators in Western Desert of Egypt, employing this combined TCP-ESP technique which has resulted in significant savings in rig time and increased operating efficiency. This paper summarizes the practical experiences gained during the development and deployment of this integrated technique, in addition to an evaluation of the impact compared to the conventional perforation techniques through ESP downhole sensor data and well modelling.","PeriodicalId":153269,"journal":{"name":"Day 2 Thu, March 02, 2023","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effective Utilisation of Underbalanced Perforation with Electrical Submersible Pump's Boost Oil Production of Mature Oil Field in Western Desert of Egypt: Case Study\",\"authors\":\"M. Sayed, A. Sabaa, A. Samir, Mohamed Mokhtar, A. Medhat, A. El-Wakil\",\"doi\":\"10.2523/iptc-22793-ea\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Conventionally, the transition from completion to production often requires the well to be killed immediately after perforation is completed, thus exposing the formation to potentially damaging killing fluid. To obtain a perforation tunnel with maximum productivity, this transition requires an optimal clean-up and removal of the perforation damages.\\n Underbalance perforation through Tubing Conveyed Perforating (TCP) system is one of the best practices to ensure less damage to the perforation tunnels (perforating skin) leading to increased well productivity. However, it is very challenging in cases of completions with Electrical Submersible Pump's (ESP) to maintain productivity with undamaged reservoir by preventing any contact between reservoir and completion fluid and achieve the above simultaneously with safe well control during ESP deployment. Otherwise, the alternative solution is to run TCP string in single run then kill the well after perforation in order to install the ESP completion.\\n As a result of the increasing emphasis on reducing operating costs, maximizing well productivity, and minimizing wellbore clean-up time, an integrated solution was designed and successfully implemented for perforating artificially lifted wells in static underbalanced condition and installing ESP completion in single run without killing the well. It combines the use of TCP system equipped with automatic release gun hanger. TCP gun string has been set by Electric Line against the required intervals, then the ESP has been separately installed and the guns has been activated through an electronic firing head for a shoot-and-drop operation. The static underbalance condition has been created by the ESP thanks to the programmed delayed firing time. After this operation, the well has been directly lined up to production flowline with minimal wellbore clean-up time. The combination of static underbalanced perforation with deep penetration charges which is able to bypass invasion zone, can create a clean perforation tunnel, and significantly reduce the post-perforating damage by killing fluid, and finally maximize the well productivity. Despite the challenging reservoir conditions (Depth= 16,500 FT, Pressure=6250 Psi, Temperature= 285 deg. F, Porosity = 8%), the Productivity Index (PI) of the wells were three times compared to the offset wells.\\n Five jobs have been performed by Agiba Petroleum Company, one of the main operators in Western Desert of Egypt, employing this combined TCP-ESP technique which has resulted in significant savings in rig time and increased operating efficiency. This paper summarizes the practical experiences gained during the development and deployment of this integrated technique, in addition to an evaluation of the impact compared to the conventional perforation techniques through ESP downhole sensor data and well modelling.\",\"PeriodicalId\":153269,\"journal\":{\"name\":\"Day 2 Thu, March 02, 2023\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Thu, March 02, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-22793-ea\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Thu, March 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22793-ea","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

通常,从完井到生产的过渡通常需要在射孔完成后立即压井,从而使地层暴露在具有潜在破坏性的压井液中。为了获得最大产能的射孔通道,这种过渡需要最佳的清理和消除射孔损伤。通过油管输送射孔(TCP)系统进行欠平衡射孔是确保对射孔通道(射孔表皮)损害较小,从而提高油井产能的最佳实践之一。然而,在使用电潜泵(ESP)完井的情况下,通过防止储层与完井液之间的任何接触来保持储层的生产力,同时在ESP部署过程中实现安全的井控,这是非常具有挑战性的。否则,另一种解决方案是一次下入TCP管柱,然后在射孔后压井,以安装ESP完井装置。由于人们越来越重视降低作业成本、最大化油井产能和缩短井筒清理时间,因此设计了一套综合解决方案,并成功实施,用于在静态欠平衡条件下进行人工举升井射孔,并在单趟下安装ESP完井,而不会压井。它结合了TCP系统的使用,配备了自动释放枪悬挂器。TCP射孔枪管柱由Electric Line按照要求的间隔下入,然后单独安装ESP,通过电子发射头激活射孔枪,进行射孔-投下操作。由于程序设定的延迟发射时间,ESP产生了静态欠平衡状态。该作业完成后,井直接与生产流水线对接,井筒清理时间最短。静态欠平衡射孔与能够绕过侵入层的深射孔药相结合,可以创建一个干净的射孔通道,并通过压井液显著减少射孔后的损害,最终最大限度地提高油井产能。尽管具有挑战性的储层条件(深度为16,500 FT,压力为6250 Psi,温度为285°F,孔隙度为8%),但该井的产能指数(PI)是邻井的3倍。Agiba石油公司是埃及西部沙漠地区的主要作业者之一,该公司已经完成了五项作业,采用了TCP-ESP技术,大大节省了钻机时间,提高了作业效率。本文总结了该综合技术在开发和部署过程中获得的实践经验,并通过ESP井下传感器数据和井模型对其与常规射孔技术的影响进行了评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Effective Utilisation of Underbalanced Perforation with Electrical Submersible Pump's Boost Oil Production of Mature Oil Field in Western Desert of Egypt: Case Study
Conventionally, the transition from completion to production often requires the well to be killed immediately after perforation is completed, thus exposing the formation to potentially damaging killing fluid. To obtain a perforation tunnel with maximum productivity, this transition requires an optimal clean-up and removal of the perforation damages. Underbalance perforation through Tubing Conveyed Perforating (TCP) system is one of the best practices to ensure less damage to the perforation tunnels (perforating skin) leading to increased well productivity. However, it is very challenging in cases of completions with Electrical Submersible Pump's (ESP) to maintain productivity with undamaged reservoir by preventing any contact between reservoir and completion fluid and achieve the above simultaneously with safe well control during ESP deployment. Otherwise, the alternative solution is to run TCP string in single run then kill the well after perforation in order to install the ESP completion. As a result of the increasing emphasis on reducing operating costs, maximizing well productivity, and minimizing wellbore clean-up time, an integrated solution was designed and successfully implemented for perforating artificially lifted wells in static underbalanced condition and installing ESP completion in single run without killing the well. It combines the use of TCP system equipped with automatic release gun hanger. TCP gun string has been set by Electric Line against the required intervals, then the ESP has been separately installed and the guns has been activated through an electronic firing head for a shoot-and-drop operation. The static underbalance condition has been created by the ESP thanks to the programmed delayed firing time. After this operation, the well has been directly lined up to production flowline with minimal wellbore clean-up time. The combination of static underbalanced perforation with deep penetration charges which is able to bypass invasion zone, can create a clean perforation tunnel, and significantly reduce the post-perforating damage by killing fluid, and finally maximize the well productivity. Despite the challenging reservoir conditions (Depth= 16,500 FT, Pressure=6250 Psi, Temperature= 285 deg. F, Porosity = 8%), the Productivity Index (PI) of the wells were three times compared to the offset wells. Five jobs have been performed by Agiba Petroleum Company, one of the main operators in Western Desert of Egypt, employing this combined TCP-ESP technique which has resulted in significant savings in rig time and increased operating efficiency. This paper summarizes the practical experiences gained during the development and deployment of this integrated technique, in addition to an evaluation of the impact compared to the conventional perforation techniques through ESP downhole sensor data and well modelling.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Advancement of Open Hole Gravel Pack and Zonal Isolation with Selective Intelligent Completion in Deepwater Malaysia Reaching Beyond the Limit, the Furthest Step Out S Shape Wells in Deep Gas Well Project Application and Performance Monitoring of Compound Air Plasma Lightning Rejection System Malaysia's First Use of Subsea Release Plug System for Dual Barrier Offline Cementing (DBOC) Across Hydrocarbon Section Helps Streamline Activities Drilling Weak Formations in Rumaila Field in Southern Iraq — Modelling Shear Failure Using Numerical Models
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1