配电网的经济规划

A. Chandel, D. Chauhan, D. Singh
{"title":"配电网的经济规划","authors":"A. Chandel, D. Chauhan, D. Singh","doi":"10.1109/ISGT-ASIA.2014.6873830","DOIUrl":null,"url":null,"abstract":"Recently there has been a considerable revival in interest in connecting generation to the distribution network in the form of Distributed Energy Resources (DER). DER benefits are site specific. In order to optimize the advantages of distributed generation it holds compulsively to reform management and to re-validate the operations of distribution network. Minimization of related costs and satisfying technical and physical constraints is also the key issue to concentrate. This paper presents a GA based methodology for DER planning in 37-bus IEEE distribution system for constant loading conditions. Various loading levels as specified by discos are taken into consideration. Further the subsystem and integrated distribution system is also taken into consideration.","PeriodicalId":444960,"journal":{"name":"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic planning of distribution system\",\"authors\":\"A. Chandel, D. Chauhan, D. Singh\",\"doi\":\"10.1109/ISGT-ASIA.2014.6873830\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recently there has been a considerable revival in interest in connecting generation to the distribution network in the form of Distributed Energy Resources (DER). DER benefits are site specific. In order to optimize the advantages of distributed generation it holds compulsively to reform management and to re-validate the operations of distribution network. Minimization of related costs and satisfying technical and physical constraints is also the key issue to concentrate. This paper presents a GA based methodology for DER planning in 37-bus IEEE distribution system for constant loading conditions. Various loading levels as specified by discos are taken into consideration. Further the subsystem and integrated distribution system is also taken into consideration.\",\"PeriodicalId\":444960,\"journal\":{\"name\":\"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGT-ASIA.2014.6873830\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-ASIA.2014.6873830","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

最近,以分布式能源(DER)的形式将发电连接到配电网的兴趣已经相当大了。DER的好处是特定于网站的。为了优化分布式发电的优势,必须对配电网的管理进行改革,对配电网的运行进行重新验证。将相关成本降至最低,满足技术和物理限制也是需要关注的关键问题。本文提出了一种基于遗传算法的37总线IEEE配电系统恒载条件下的DER规划方法。考虑到迪斯科指定的各种加载水平。此外,还考虑了分系统和综合配电系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Economic planning of distribution system
Recently there has been a considerable revival in interest in connecting generation to the distribution network in the form of Distributed Energy Resources (DER). DER benefits are site specific. In order to optimize the advantages of distributed generation it holds compulsively to reform management and to re-validate the operations of distribution network. Minimization of related costs and satisfying technical and physical constraints is also the key issue to concentrate. This paper presents a GA based methodology for DER planning in 37-bus IEEE distribution system for constant loading conditions. Various loading levels as specified by discos are taken into consideration. Further the subsystem and integrated distribution system is also taken into consideration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A measurement technique to identify and locate partial discharge in transformer with AE and HFCT Fast fault recovery of a grid integrated wind farm based HVDC Light transmission system Voltage profile and loss assessment of distribution systems with fixed speed wind generators Industrial CHP optimal management in the energy market under incomplete information A scope for the research and argument activities on electric vehicle development mode in demonstration city
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1