{"title":"考虑风电场不确定性的短期动态输电扩张规划","authors":"M. Moghaddam, Sanaz Mahmoudi, B. Alizadeh","doi":"10.1109/PECON.2016.7951469","DOIUrl":null,"url":null,"abstract":"Transmission expansion planning should be performed according to the load growth to encourage and facilitate competition in the electricity markets, and meet the environmental, political, economic and technical constraints, appropriately. This paper presents a new framework for the stochastic short-term Dynamic Transmission Expansion Planning (DTEP) problem taking into account the uncertainties related to the load demand, output power of wind farms (OPWFs), and Local Marginal Prices (LMPs). Besides, methods to evaluate the load demand and OPWFs uncertainties can affect the quality of expansion plans. Therefore, in this paper, two different methods, Monte Carlo simulation (MCS) and Taguchi's Orthogonal Array Testing (TOAT), are used to model these uncertainties. The comparison of the results given by the proposed DTEP structure on the Garver 6-bus test system demonstrates the higher efficiency of MCS plans than TOAT.","PeriodicalId":259969,"journal":{"name":"2016 IEEE International Conference on Power and Energy (PECon)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Short-term dynamic transmission expansion planning considering wind farms' uncertainty\",\"authors\":\"M. Moghaddam, Sanaz Mahmoudi, B. Alizadeh\",\"doi\":\"10.1109/PECON.2016.7951469\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transmission expansion planning should be performed according to the load growth to encourage and facilitate competition in the electricity markets, and meet the environmental, political, economic and technical constraints, appropriately. This paper presents a new framework for the stochastic short-term Dynamic Transmission Expansion Planning (DTEP) problem taking into account the uncertainties related to the load demand, output power of wind farms (OPWFs), and Local Marginal Prices (LMPs). Besides, methods to evaluate the load demand and OPWFs uncertainties can affect the quality of expansion plans. Therefore, in this paper, two different methods, Monte Carlo simulation (MCS) and Taguchi's Orthogonal Array Testing (TOAT), are used to model these uncertainties. The comparison of the results given by the proposed DTEP structure on the Garver 6-bus test system demonstrates the higher efficiency of MCS plans than TOAT.\",\"PeriodicalId\":259969,\"journal\":{\"name\":\"2016 IEEE International Conference on Power and Energy (PECon)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Power and Energy (PECon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PECON.2016.7951469\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Power and Energy (PECon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2016.7951469","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transmission expansion planning should be performed according to the load growth to encourage and facilitate competition in the electricity markets, and meet the environmental, political, economic and technical constraints, appropriately. This paper presents a new framework for the stochastic short-term Dynamic Transmission Expansion Planning (DTEP) problem taking into account the uncertainties related to the load demand, output power of wind farms (OPWFs), and Local Marginal Prices (LMPs). Besides, methods to evaluate the load demand and OPWFs uncertainties can affect the quality of expansion plans. Therefore, in this paper, two different methods, Monte Carlo simulation (MCS) and Taguchi's Orthogonal Array Testing (TOAT), are used to model these uncertainties. The comparison of the results given by the proposed DTEP structure on the Garver 6-bus test system demonstrates the higher efficiency of MCS plans than TOAT.