{"title":"ANALISA SISTEM PENTANAHAN TRANSFORMATOR","authors":"Irine Kartika Febrianti","doi":"10.31851/ampere.v3i1.2146","DOIUrl":null,"url":null,"abstract":"Grounding is connecting a circuit or equipment to the earth. Poor earthing systems can lead to decreased quality of electric power. Studies of land is often underestimated, but a good grounding is very important.While doing research in substations gutter oil, load imbalance on a substation Gutter oil, causing the flow of each phase at # 3 60MVA power transformer 150/20 KVPT. PLN (Persero) substation Talang Kelapa Banyuasin become unbalanced that I R = 954.37 A, I S = 968.32, I T = 950.24 A. The amount of load imbalance (%) between each phase at # 3 60MVA power transformer 150/20 KV is 0.7412%, This is because the use of an uneven load. As a result of load imbalance between each phase at # 3 60MVA power transformer 150/20 kV, the current will flow in the neutral transformer I N = 16,40574  -72,59  . power loss due to the neutral current is 0.7073 W. neutral point voltage to ground -22.32 V. neutral current flowing to ground is 23.1768 A. power loss due to neutral current flowing to ground is 1 , 4116 W. current flowing to the ground from the second transformer is 22.23699 Ampere. Prisoners to the substation earthing gutter oil is R 1 0,0692 Ω and R 2 0,1856 Ω, while the resistance value of the grounding in a way parallel 1Ω , so either one very effective way to lose custody of land is to deepen the grounding electrode","PeriodicalId":404492,"journal":{"name":"Jurnal Ampere","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ampere","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31851/ampere.v3i1.2146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

接地是将电路或设备连接到地球上。不良的接地系统会导致电力质量下降。对土地的研究常常被低估,但良好的基础是非常重要的。在对变电站地沟油进行研究时,发现某变电站地沟油负载不平衡,造成3 # 60MVA电力变压器各相流量150/20 KVPT。PLN (Persero)变电站Talang Kelapa Banyuasin失平衡,R = 954.37 A, S = 968.32, T = 950.24 A。3号60MVA电力变压器150/ 20kv各相负载不平衡量(%)为0.7412%,这是由于使用了不均匀负载。由于3号60MVA电力变压器150/ 20kv各相负载不平衡,电流将流过中性点变压器I N = 1640574-72,59。中性点对地电压-22.32 V.中性点对地电流为23.1768 A.中性点对地电流为14116 W.中性点对地电流为22.23699安培。向变电所接地的地沟油是r10,0692 Ω和r2,1856 Ω,而接地的电阻值是平行的1Ω,所以无论哪一种很有效的方法都是将接地电极加深
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALISA SISTEM PENTANAHAN TRANSFORMATOR
Grounding is connecting a circuit or equipment to the earth. Poor earthing systems can lead to decreased quality of electric power. Studies of land is often underestimated, but a good grounding is very important.While doing research in substations gutter oil, load imbalance on a substation Gutter oil, causing the flow of each phase at # 3 60MVA power transformer 150/20 KVPT. PLN (Persero) substation Talang Kelapa Banyuasin become unbalanced that I R = 954.37 A, I S = 968.32, I T = 950.24 A. The amount of load imbalance (%) between each phase at # 3 60MVA power transformer 150/20 KV is 0.7412%, This is because the use of an uneven load. As a result of load imbalance between each phase at # 3 60MVA power transformer 150/20 kV, the current will flow in the neutral transformer I N = 16,40574  -72,59  . power loss due to the neutral current is 0.7073 W. neutral point voltage to ground -22.32 V. neutral current flowing to ground is 23.1768 A. power loss due to neutral current flowing to ground is 1 , 4116 W. current flowing to the ground from the second transformer is 22.23699 Ampere. Prisoners to the substation earthing gutter oil is R 1 0,0692 Ω and R 2 0,1856 Ω, while the resistance value of the grounding in a way parallel 1Ω , so either one very effective way to lose custody of land is to deepen the grounding electrode
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengendali Kecepatan Motor DC Terhadap Perubahan Suhu Menggunakan PLC dan Human Machine Interface Analisis Kinerja PLTS 200WP Secara Realtime Menggunakan IoT Efisiensi Penggunaan Daya Listrik Di Hotel Carrissima Palembang Smart Home Menggunakan PLC Outseal Berbasis Internet Of Things Perancangan Software Impedansi Total Sistem Rangkaian Listrik Menggunakan Metode Gabriel Kron
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1