{"title":"ANALISA SISTEM PENTANAHAN TRANSFORMATOR","authors":"Irine Kartika Febrianti","doi":"10.31851/ampere.v3i1.2146","DOIUrl":null,"url":null,"abstract":"Grounding is connecting a circuit or equipment to the earth. Poor earthing systems can lead to decreased quality of electric power. Studies of land is often underestimated, but a good grounding is very important.While doing research in substations gutter oil, load imbalance on a substation Gutter oil, causing the flow of each phase at # 3 60MVA power transformer 150/20 KVPT. PLN (Persero) substation Talang Kelapa Banyuasin become unbalanced that I R = 954.37 A, I S = 968.32, I T = 950.24 A. The amount of load imbalance (%) between each phase at # 3 60MVA power transformer 150/20 KV is 0.7412%, This is because the use of an uneven load. As a result of load imbalance between each phase at # 3 60MVA power transformer 150/20 kV, the current will flow in the neutral transformer I N = 16,40574 -72,59 . power loss due to the neutral current is 0.7073 W. neutral point voltage to ground -22.32 V. neutral current flowing to ground is 23.1768 A. power loss due to neutral current flowing to ground is 1 , 4116 W. current flowing to the ground from the second transformer is 22.23699 Ampere. Prisoners to the substation earthing gutter oil is R 1 0,0692 Ω and R 2 0,1856 Ω, while the resistance value of the grounding in a way parallel 1Ω , so either one very effective way to lose custody of land is to deepen the grounding electrode","PeriodicalId":404492,"journal":{"name":"Jurnal Ampere","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ampere","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31851/ampere.v3i1.2146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
接地是将电路或设备连接到地球上。不良的接地系统会导致电力质量下降。对土地的研究常常被低估,但良好的基础是非常重要的。在对变电站地沟油进行研究时,发现某变电站地沟油负载不平衡,造成3 # 60MVA电力变压器各相流量150/20 KVPT。PLN (Persero)变电站Talang Kelapa Banyuasin失平衡,R = 954.37 A, S = 968.32, T = 950.24 A。3号60MVA电力变压器150/ 20kv各相负载不平衡量(%)为0.7412%,这是由于使用了不均匀负载。由于3号60MVA电力变压器150/ 20kv各相负载不平衡,电流将流过中性点变压器I N = 1640574-72,59。中性点对地电压-22.32 V.中性点对地电流为23.1768 A.中性点对地电流为14116 W.中性点对地电流为22.23699安培。向变电所接地的地沟油是r10,0692 Ω和r2,1856 Ω,而接地的电阻值是平行的1Ω,所以无论哪一种很有效的方法都是将接地电极加深
Grounding is connecting a circuit or equipment to the earth. Poor earthing systems can lead to decreased quality of electric power. Studies of land is often underestimated, but a good grounding is very important.While doing research in substations gutter oil, load imbalance on a substation Gutter oil, causing the flow of each phase at # 3 60MVA power transformer 150/20 KVPT. PLN (Persero) substation Talang Kelapa Banyuasin become unbalanced that I R = 954.37 A, I S = 968.32, I T = 950.24 A. The amount of load imbalance (%) between each phase at # 3 60MVA power transformer 150/20 KV is 0.7412%, This is because the use of an uneven load. As a result of load imbalance between each phase at # 3 60MVA power transformer 150/20 kV, the current will flow in the neutral transformer I N = 16,40574 -72,59 . power loss due to the neutral current is 0.7073 W. neutral point voltage to ground -22.32 V. neutral current flowing to ground is 23.1768 A. power loss due to neutral current flowing to ground is 1 , 4116 W. current flowing to the ground from the second transformer is 22.23699 Ampere. Prisoners to the substation earthing gutter oil is R 1 0,0692 Ω and R 2 0,1856 Ω, while the resistance value of the grounding in a way parallel 1Ω , so either one very effective way to lose custody of land is to deepen the grounding electrode