与更早的方法平行于机器上的生产安排管理

Migunani, Danang Nur Cahyo
{"title":"与更早的方法平行于机器上的生产安排管理","authors":"Migunani, Danang Nur Cahyo","doi":"10.51903/elkom.v12i2.173","DOIUrl":null,"url":null,"abstract":"The management of production and operations in factory machinery is an optimal management effort in the use of resources consisting of labor, machinery, equipment and raw materials. The production and operations manager directs various inputs in order to produce various outputs or results in units of quantity, quality, price, specific time and location according to consumer demand. Efficiency and effectiveness of the production process to be achieved requires proper scheduling management so that the production output produced can be completed according to target. Management of production and customer orders is still simple, besides that the status of raw material inventories that cannot be directly known can often result in delays in the production process and even production cannot be done as soon as possible. Scheduling orders that enter using the system first in first out where the first order that comes is done, but has not considered the number of orders, priority of customers, maturity of workmanship and engine capacity so that the estimated completion of the order can not be known. To make it more efficient and directed, the Earliest Due Date method is used by sorting the production work based on the closest due date. This method can be used for scheduling on one machine or for scheduling on several machines (parallel machine) so that the scheduling management information system can manage effective production scheduling and produce production reports automatically as needed.","PeriodicalId":118486,"journal":{"name":"Elkom : Jurnal Elektronika dan Komputer","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IPLEMENTASI MANAJEMEN PENJADWALAN PRODUKSI PADA MESIN SECARA PARALEL DENGAN METODE EARLIEST DUE DATE\",\"authors\":\"Migunani, Danang Nur Cahyo\",\"doi\":\"10.51903/elkom.v12i2.173\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The management of production and operations in factory machinery is an optimal management effort in the use of resources consisting of labor, machinery, equipment and raw materials. The production and operations manager directs various inputs in order to produce various outputs or results in units of quantity, quality, price, specific time and location according to consumer demand. Efficiency and effectiveness of the production process to be achieved requires proper scheduling management so that the production output produced can be completed according to target. Management of production and customer orders is still simple, besides that the status of raw material inventories that cannot be directly known can often result in delays in the production process and even production cannot be done as soon as possible. Scheduling orders that enter using the system first in first out where the first order that comes is done, but has not considered the number of orders, priority of customers, maturity of workmanship and engine capacity so that the estimated completion of the order can not be known. To make it more efficient and directed, the Earliest Due Date method is used by sorting the production work based on the closest due date. This method can be used for scheduling on one machine or for scheduling on several machines (parallel machine) so that the scheduling management information system can manage effective production scheduling and produce production reports automatically as needed.\",\"PeriodicalId\":118486,\"journal\":{\"name\":\"Elkom : Jurnal Elektronika dan Komputer\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Elkom : Jurnal Elektronika dan Komputer\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51903/elkom.v12i2.173\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elkom : Jurnal Elektronika dan Komputer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51903/elkom.v12i2.173","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

工厂机械的生产经营管理是对劳动力、机器、设备和原材料等资源的优化管理。生产经营经理根据消费者的需求,以数量、质量、价格、具体时间和地点为单位,指导各种投入,以产生各种产出或结果。要实现生产过程的效率和有效性,就需要对生产过程进行适当的调度管理,使生产产出能够按目标完成。生产和客户订单的管理仍然很简单,而且不能直接知道的原材料库存状态往往会导致生产过程的延误,甚至不能尽快生产。调度订单使用系统先进先出,其中第一个订单已经完成,但没有考虑订单数量、客户优先级、工艺成熟度和发动机容量,因此无法知道订单的估计完成情况。为了使其更有效和更有针对性,使用了基于最接近的截止日期对生产工作进行排序的最早截止日期方法。该方法既可用于单机调度,也可用于多机(并行机)调度,使调度管理信息系统能够有效地管理生产调度,并根据需要自动生成生产报告。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
IPLEMENTASI MANAJEMEN PENJADWALAN PRODUKSI PADA MESIN SECARA PARALEL DENGAN METODE EARLIEST DUE DATE
The management of production and operations in factory machinery is an optimal management effort in the use of resources consisting of labor, machinery, equipment and raw materials. The production and operations manager directs various inputs in order to produce various outputs or results in units of quantity, quality, price, specific time and location according to consumer demand. Efficiency and effectiveness of the production process to be achieved requires proper scheduling management so that the production output produced can be completed according to target. Management of production and customer orders is still simple, besides that the status of raw material inventories that cannot be directly known can often result in delays in the production process and even production cannot be done as soon as possible. Scheduling orders that enter using the system first in first out where the first order that comes is done, but has not considered the number of orders, priority of customers, maturity of workmanship and engine capacity so that the estimated completion of the order can not be known. To make it more efficient and directed, the Earliest Due Date method is used by sorting the production work based on the closest due date. This method can be used for scheduling on one machine or for scheduling on several machines (parallel machine) so that the scheduling management information system can manage effective production scheduling and produce production reports automatically as needed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Perbandingan Metode Naïve Bayes Classifier Dan Support Vector Machine Pada Kasus Analisis Sentimen Terhadap Data Vaksin Covid-19 Di Twitter PERANCANGAN SENSOR KADAR OKSIGEN UNTUK IDENTIFIKASI PENDERITA STROKE DENGAN METODE NON INVASIVE Perancangan Alat Pendeteksi Asap dan Suhu Ruangan Berbasis Internet Of Think di PT. APAC Inti Corpora Sistem Rekomendasi Event Online Menggunakan Metode Content Based Filtering Rancang Bangun Design UI/ UX pada Aplikasi PANTAU menggunakan Pendekatan Design Thinking
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1