{"title":"能源调控市场下基于mip的抽水蓄能电站最优调度","authors":"S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi","doi":"10.1109/UPEC.2008.4651465","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"A MIP-based optimal operation scheduling of pumped-storage plant in the energy and regulation markets\",\"authors\":\"S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi\",\"doi\":\"10.1109/UPEC.2008.4651465\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.\",\"PeriodicalId\":287461,\"journal\":{\"name\":\"2008 43rd International Universities Power Engineering Conference\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 43rd International Universities Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2008.4651465\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

摘要

研究了单个抽水蓄能电站同时参与能源市场和调节市场的最优调度问题。目标是在满足所有技术限制的情况下,实现电厂参与前一天(DA)能源和监管市场时的最大预期利润。将该最优调度问题表述为混合整数规划(MIP)问题。讨论了一个实例的数值结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A MIP-based optimal operation scheduling of pumped-storage plant in the energy and regulation markets
This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study on model of power grid operation security cost in market environment Hybrid cascaded H- bridge multilevel inverter for fuel cell power conditioning systems Fault ride-through capability improvement of wind farms using doubly fed induction generator Protection, transient stability and fault ride-through issues in distribution networks with dispersed generation An architecture of spatial three dimension visualization information platform for urban power grid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1