{"title":"采用IEC 61850-9-2标准的过程母线的变压器差动保护中时间同步损失的影响","authors":"G. Igarashi, J. C. Santos","doi":"10.1109/ISGTEUROPE.2014.7028753","DOIUrl":null,"url":null,"abstract":"Our aim is to show the results from a mathematical simulation of the behavior of a differential protection algorithm for power transformers compared with the loss of the time synchronization signal in the process bus according to IEC 61850-9-2. Described herein are an original model for simulating the samples in the process bus, a proposed algorithm for differential protection of power transformers adapted for protective relays operating with process bus according to standard and response analysis of the protection algorithm from this loss of sync.","PeriodicalId":299515,"journal":{"name":"IEEE PES Innovative Smart Grid Technologies, Europe","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Effects of loss of time synchronization in differential protection of transformers using process bus according to IEC 61850-9-2\",\"authors\":\"G. Igarashi, J. C. Santos\",\"doi\":\"10.1109/ISGTEUROPE.2014.7028753\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Our aim is to show the results from a mathematical simulation of the behavior of a differential protection algorithm for power transformers compared with the loss of the time synchronization signal in the process bus according to IEC 61850-9-2. Described herein are an original model for simulating the samples in the process bus, a proposed algorithm for differential protection of power transformers adapted for protective relays operating with process bus according to standard and response analysis of the protection algorithm from this loss of sync.\",\"PeriodicalId\":299515,\"journal\":{\"name\":\"IEEE PES Innovative Smart Grid Technologies, Europe\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES Innovative Smart Grid Technologies, Europe\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEUROPE.2014.7028753\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES Innovative Smart Grid Technologies, Europe","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEUROPE.2014.7028753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Effects of loss of time synchronization in differential protection of transformers using process bus according to IEC 61850-9-2
Our aim is to show the results from a mathematical simulation of the behavior of a differential protection algorithm for power transformers compared with the loss of the time synchronization signal in the process bus according to IEC 61850-9-2. Described herein are an original model for simulating the samples in the process bus, a proposed algorithm for differential protection of power transformers adapted for protective relays operating with process bus according to standard and response analysis of the protection algorithm from this loss of sync.