{"title":"价值流图和工作抽样在印度某工业项目中的适用性","authors":"Lavina Susan Pothen, S. Ramalingam","doi":"10.24928/2018/0263","DOIUrl":null,"url":null,"abstract":"Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Applicability of Value Stream Mapping and Work Sampling in an Industrial Project in India\",\"authors\":\"Lavina Susan Pothen, S. Ramalingam\",\"doi\":\"10.24928/2018/0263\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0263\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0263","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
摘要
生产过程中的低生产率和低效率是建筑行业令人担忧的问题,也侵蚀了项目的价值主张。价值流映射(VSM)和工作抽样(WS)是“精益”理念中的两种重要技术,旨在减少和最小化活动生命周期过程中的“浪费”,从而帮助最大限度地提高生产率。在本文中,我们通过基于行动的研究方法,讨论了这两种技术在印度一个工业项目中的实施挑战和好处。真空脱水混凝土楼板施工采用VSM,砌块作业采用tour - based WS。VSM帮助可视化整个过程,并减少了2.5天的超时时间。对替代材料进行了成本估算和比较,以减少成本超支。WS技术帮助承包商评估生产率,并确定生产率低于平均水平的原因。随后的纠正措施计划和建议减少了非增值浪费,提高了绩效。本研究为从业者在实践中系统地采用这些精益技术,从而优化流程,减少浪费,提高生产力奠定了基础。
Applicability of Value Stream Mapping and Work Sampling in an Industrial Project in India
Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.