{"title":"价值流图和工作抽样在印度某工业项目中的适用性","authors":"Lavina Susan Pothen, S. Ramalingam","doi":"10.24928/2018/0263","DOIUrl":null,"url":null,"abstract":"Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Applicability of Value Stream Mapping and Work Sampling in an Industrial Project in India\",\"authors\":\"Lavina Susan Pothen, S. Ramalingam\",\"doi\":\"10.24928/2018/0263\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0263\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0263","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

生产过程中的低生产率和低效率是建筑行业令人担忧的问题,也侵蚀了项目的价值主张。价值流映射(VSM)和工作抽样(WS)是“精益”理念中的两种重要技术,旨在减少和最小化活动生命周期过程中的“浪费”,从而帮助最大限度地提高生产率。在本文中,我们通过基于行动的研究方法,讨论了这两种技术在印度一个工业项目中的实施挑战和好处。真空脱水混凝土楼板施工采用VSM,砌块作业采用tour - based WS。VSM帮助可视化整个过程,并减少了2.5天的超时时间。对替代材料进行了成本估算和比较,以减少成本超支。WS技术帮助承包商评估生产率,并确定生产率低于平均水平的原因。随后的纠正措施计划和建议减少了非增值浪费,提高了绩效。本研究为从业者在实践中系统地采用这些精益技术,从而优化流程,减少浪费,提高生产力奠定了基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Applicability of Value Stream Mapping and Work Sampling in an Industrial Project in India
Poor productivity and inefficiencies in the production process are alarming issues in the construction industry that also erode the value proposition of projects. Value Stream Mapping (VSM) and Work Sampling (WS) are two important techniques in the ‘Lean’ philosophy that aim at reducing and minimizing ‘waste’ in the life cycle process of activities and thereby aide in maximizing productivity. In this paper, we discuss the implementation challenges and benefits of these two techniques in an industrial project in India through an action-based research methodology. While VSM was adopted for Vacuum Dewatering Concrete Flooring works, tour based WS was done for block-work activity. VSM helped to visualize the entire process and reduce time overrun by 2.5 days. Alternative materials were cost estimated and compared to reduce cost overrun. The WS technique helped the contractor to assess the productivity rate and identify reasons for below average productivity. Subsequent corrective action plans and recommendations led to reduce non-value added wastes and improve performance. This study lays a foundation for practitioners to systematically adopt these lean techniques in practice and thereby optimize the process, reduce wastes and enhance productivity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects Complex Production Systems: Non-Linear and Non-Repetitive Projects Towards Facility Management Participation in Design: A UCSF Case Study Project Delivery Through Lean Principles Across All Disciplnes of Construction in a Developing Country Environment Short Takt Time in Construction – a Practical Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1