{"title":"输入混合模拟建模施工操作","authors":"O. Bokor, Laura Florez Perez, Barry J. Gledson, A. Osborne","doi":"10.3311/ccc2019-078","DOIUrl":null,"url":null,"abstract":"Good pre-construction planning efforts are a vital part of the effective management and delivery of construction projects. In order to prepare more accurate schedules and cost calculations, realistic productivity rates to improve precision are needed. The use of simulation for modelling the elements of construction processes can assist with this aspiration. The application of hybrid simulation approaches is particularly appropriate as they can capture complicated behaviour, uncertainties, and dependencies. This paper \ndiscusses the use of one such approach combining discrete-event simulation (DES) and system dynamics (SD) to determine more accurate productivity rates. The DES component models the operations with the workflow of the tasks performed. Its input consists of the task elements with their durations and resource information. The factors that influence the productivity rates are taken into \naccount with the help of the SD component. Input for this part of the model includes the factors as well as considerations of their interrelationships and effects. In this work, a case study of such input data for masonry works – for brick- and blockwork – is presented. It shows the input data and its integration in the DES-SD approach for modellers to determine more realistic productivity rates.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Input for Hybrid Simulation Modelling Construction Operations\",\"authors\":\"O. Bokor, Laura Florez Perez, Barry J. Gledson, A. Osborne\",\"doi\":\"10.3311/ccc2019-078\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Good pre-construction planning efforts are a vital part of the effective management and delivery of construction projects. In order to prepare more accurate schedules and cost calculations, realistic productivity rates to improve precision are needed. The use of simulation for modelling the elements of construction processes can assist with this aspiration. The application of hybrid simulation approaches is particularly appropriate as they can capture complicated behaviour, uncertainties, and dependencies. This paper \\ndiscusses the use of one such approach combining discrete-event simulation (DES) and system dynamics (SD) to determine more accurate productivity rates. The DES component models the operations with the workflow of the tasks performed. Its input consists of the task elements with their durations and resource information. The factors that influence the productivity rates are taken into \\naccount with the help of the SD component. Input for this part of the model includes the factors as well as considerations of their interrelationships and effects. In this work, a case study of such input data for masonry works – for brick- and blockwork – is presented. It shows the input data and its integration in the DES-SD approach for modellers to determine more realistic productivity rates.\",\"PeriodicalId\":231420,\"journal\":{\"name\":\"Proceedings of the Creative Construction Conference 2019\",\"volume\":\"60 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Creative Construction Conference 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ccc2019-078\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-078","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

良好的施工前规划工作是有效管理和交付建设项目的重要组成部分。为了准备更精确的进度和成本计算,需要实际的生产率来提高精度。使用模拟技术对施工过程的要素进行建模,可以帮助实现这一愿望。混合模拟方法的应用是特别合适的,因为它们可以捕获复杂的行为、不确定性和依赖性。本文讨论了一种将离散事件模拟(DES)和系统动力学(SD)相结合的方法来确定更准确的生产率。DES组件用所执行任务的工作流对操作进行建模。它的输入包括任务元素及其持续时间和资源信息。在SD组件的帮助下,考虑了影响生产率的因素。这部分模型的输入包括各种因素以及对它们相互关系和影响的考虑。在这项工作中,这种输入数据为砖石工程的案例研究-砖和砌块-提出。它显示了输入数据及其在DES-SD方法中的集成,以供建模人员确定更实际的生产率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Input for Hybrid Simulation Modelling Construction Operations
Good pre-construction planning efforts are a vital part of the effective management and delivery of construction projects. In order to prepare more accurate schedules and cost calculations, realistic productivity rates to improve precision are needed. The use of simulation for modelling the elements of construction processes can assist with this aspiration. The application of hybrid simulation approaches is particularly appropriate as they can capture complicated behaviour, uncertainties, and dependencies. This paper discusses the use of one such approach combining discrete-event simulation (DES) and system dynamics (SD) to determine more accurate productivity rates. The DES component models the operations with the workflow of the tasks performed. Its input consists of the task elements with their durations and resource information. The factors that influence the productivity rates are taken into account with the help of the SD component. Input for this part of the model includes the factors as well as considerations of their interrelationships and effects. In this work, a case study of such input data for masonry works – for brick- and blockwork – is presented. It shows the input data and its integration in the DES-SD approach for modellers to determine more realistic productivity rates.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Input for Hybrid Simulation Modelling Construction Operations What are the Barriers and Drivers Toward BIM Adoption in Nigeria? Ontology Assisted Collaboration Sessions on 4D BIM A Balanced Scorecard for Assessing Automation in Construction Traceability for Built Assets: Proposed Framework for a Digital Record
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1