考虑完工时间和流程时间标准的钣金车间调度

H. Crauwels, B. Verlinden, D. Cattrysse, D. Oudheusden
{"title":"考虑完工时间和流程时间标准的钣金车间调度","authors":"H. Crauwels, B. Verlinden, D. Cattrysse, D. Oudheusden","doi":"10.2174/1874243201004010012","DOIUrl":null,"url":null,"abstract":"Sheet-metal parts typically follow a unidirectional flow in the sheet-metal shop. In the first cutting stage, a large sheet is cut to different unfolded parts with a laser cutting machine. To avoid waste material different parts are combined on a sheet. Next, the 2D parts are transformed to 3D products with air bending. In this bending stage, time- consuming set-ups between production layouts are reduced as much as possible. Separate optimisation of cutting and air bending causes the optimisation benefits to counteract one another. Integrated models have been proposed for both single- and multiple-machine classes, but calculation times are too high and avoidable changeovers still occur. In this paper, by applying variable neighbourhood search with a number of different starting solutions, local optima of good quality are determined for minimising the makespan and the total flow time for both the single-machine and the multi-machine classes. Because the two performance measures are important for a good production plan, bicriteria optimisation by means of a simultaneous and a hierarchical approach, is also considered. Compared to the mathematical programming models for the combined cutting and bending operations, both quality and required computation time are improved for several real-life instances.","PeriodicalId":337071,"journal":{"name":"The Open Operational Research Journal","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Sheet-Metal Shop Scheduling Considering Makespan and Flow Time Criteria\",\"authors\":\"H. Crauwels, B. Verlinden, D. Cattrysse, D. Oudheusden\",\"doi\":\"10.2174/1874243201004010012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sheet-metal parts typically follow a unidirectional flow in the sheet-metal shop. In the first cutting stage, a large sheet is cut to different unfolded parts with a laser cutting machine. To avoid waste material different parts are combined on a sheet. Next, the 2D parts are transformed to 3D products with air bending. In this bending stage, time- consuming set-ups between production layouts are reduced as much as possible. Separate optimisation of cutting and air bending causes the optimisation benefits to counteract one another. Integrated models have been proposed for both single- and multiple-machine classes, but calculation times are too high and avoidable changeovers still occur. In this paper, by applying variable neighbourhood search with a number of different starting solutions, local optima of good quality are determined for minimising the makespan and the total flow time for both the single-machine and the multi-machine classes. Because the two performance measures are important for a good production plan, bicriteria optimisation by means of a simultaneous and a hierarchical approach, is also considered. Compared to the mathematical programming models for the combined cutting and bending operations, both quality and required computation time are improved for several real-life instances.\",\"PeriodicalId\":337071,\"journal\":{\"name\":\"The Open Operational Research Journal\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Open Operational Research Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2174/1874243201004010012\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Open Operational Research Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2174/1874243201004010012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在钣金车间中,钣金零件通常遵循单向流动。在第一个切割阶段,用激光切割机将大片切割成不同的展开部分。为了避免浪费材料,不同的部分组合在一张纸上。然后,通过空气弯曲将二维零件转化为三维产品。在这个弯曲阶段,生产布局之间耗时的设置尽可能地减少。切割和空气弯曲的单独优化导致优化效益相互抵消。已经提出了单机和多机类的集成模型,但计算时间太高,并且仍然发生可避免的转换。本文通过应用具有多个不同起始解的变邻域搜索,确定了单机类和多机类的最大完工时间和总流时间的高质量局部最优解。由于这两种性能指标对于良好的生产计划非常重要,因此还考虑了通过同时和分层方法进行双标准优化。与切割和弯曲组合操作的数学规划模型相比,在几个实际实例中,质量和所需的计算时间都得到了改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Sheet-Metal Shop Scheduling Considering Makespan and Flow Time Criteria
Sheet-metal parts typically follow a unidirectional flow in the sheet-metal shop. In the first cutting stage, a large sheet is cut to different unfolded parts with a laser cutting machine. To avoid waste material different parts are combined on a sheet. Next, the 2D parts are transformed to 3D products with air bending. In this bending stage, time- consuming set-ups between production layouts are reduced as much as possible. Separate optimisation of cutting and air bending causes the optimisation benefits to counteract one another. Integrated models have been proposed for both single- and multiple-machine classes, but calculation times are too high and avoidable changeovers still occur. In this paper, by applying variable neighbourhood search with a number of different starting solutions, local optima of good quality are determined for minimising the makespan and the total flow time for both the single-machine and the multi-machine classes. Because the two performance measures are important for a good production plan, bicriteria optimisation by means of a simultaneous and a hierarchical approach, is also considered. Compared to the mathematical programming models for the combined cutting and bending operations, both quality and required computation time are improved for several real-life instances.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modeling and Analysis of the Queue Dynamics in the Nigerian Voting System On Multiobjective Duality For Variational Problems Two-Machine Flow-Shop Scheduling with Job Delivery Coordination Mean Value Cross Decomposition for Two-Stage Stochastic Linear Programming with Recourse Fuzzy Ant Colony Paradigm for Virtual Pedestrian Simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1