通过EARN值管理和EARN SCHEDULE(新esa建筑项目案例研究)预测了项目持续时间的准确性

Gde Agus Yudha Prawira Adistana, P. Mahardi, Mochamad Firmansyah Sofianto, Dian Eksana Wibowo
{"title":"通过EARN值管理和EARN SCHEDULE(新esa建筑项目案例研究)预测了项目持续时间的准确性","authors":"Gde Agus Yudha Prawira Adistana, P. Mahardi, Mochamad Firmansyah Sofianto, Dian Eksana Wibowo","doi":"10.21831/INERSIA.V14I2.22539","DOIUrl":null,"url":null,"abstract":"ABSTRACT The earn value method (EVM) has been widely recognized and proven to provide an overview of the performance of construction project implementation from the aspects of time and schedule. Specifically EVM is used to evaluate the progress of the work, so identification of deviations both on time and cost can be done early.The Earn Schedule (ES) method is an elaboration to the schedule analysis on the EVM method. This study aimed to examine and compare the capability of the two methods, namely the earn value and earn schedule methods in predicting the completion time of construction project. The research used the real data from the Unesa building project. The results showed that at week 9, the value of CPI was 1.15 or had a variant cost of 13.32% lower than the planned budget. While for the schedule aspect, both methods indicated a delay in the project with the delay variant of 0.16%. The ES method is able to give information of how long the delay in time unit of 0.02 week.Keywords: accuration, actual cost, earn value, earn schedule,  planed value  ABSTRAKMetode nilai hasil (EVM) telah dikenal luas dan terbukti mampu memberikan gambaran kinerja pelaksanaan proyek konstruksi dari aspek waktu dan jadwal. Secara khusus EVM digunakan untuk mengevaluasi progress pekerjaan sehingga dapat dilakukan identifikasi lebih awal terhadap penyimpangan baik terhadap waktu maupun biaya. Metode Earn Schedule (ES) merupakan pendalaman terhadap analisis jadwal pada metode EVM. Penelitian ini dilakukan untuk menguji dan membandingkan kemampuan dua metode yaitu metode earn value dan earn schedule dalam memprediksi waktu penyelesaian proyek konstruksi. Data penelitian menggunakan data pelaksanaan dari pembangunan proyek bangunan gedung di Unesa. Hasil penelitianmenunjukkan bahwa pada minggu ke-9, nilai CPI adalah sebesar 1,15 atau memiliki varian biaya sebesar 13,32% lebih rendah dari anggaran yang direncanakan. Sedangkan dari aspek jadwal, kedua metode mengindikasikan bahwa terjadi keterlambatan pada proyek yaitu dengan varian keterlambatan sebesar 0,16% . Metode ES mampu memberikan informasi berapa lama keterlambatan yang terjadi dalam satuan waktu yaitu sebesar 0,02 minggu. Kata Kunci: akurasi, biaya aktual, nilai hasil, earn schedule, biaya rencana","PeriodicalId":440737,"journal":{"name":"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"AKURASI PREDIKSI DURASI PENYELESAIAN PROYEK DENGAN EARN VALUE MANAGEMENT DAN EARN SCHEDULE (STUDI KASUS PROYEK BANGUNAN GEDUNG DI UNESA)\",\"authors\":\"Gde Agus Yudha Prawira Adistana, P. Mahardi, Mochamad Firmansyah Sofianto, Dian Eksana Wibowo\",\"doi\":\"10.21831/INERSIA.V14I2.22539\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The earn value method (EVM) has been widely recognized and proven to provide an overview of the performance of construction project implementation from the aspects of time and schedule. Specifically EVM is used to evaluate the progress of the work, so identification of deviations both on time and cost can be done early.The Earn Schedule (ES) method is an elaboration to the schedule analysis on the EVM method. This study aimed to examine and compare the capability of the two methods, namely the earn value and earn schedule methods in predicting the completion time of construction project. The research used the real data from the Unesa building project. The results showed that at week 9, the value of CPI was 1.15 or had a variant cost of 13.32% lower than the planned budget. While for the schedule aspect, both methods indicated a delay in the project with the delay variant of 0.16%. The ES method is able to give information of how long the delay in time unit of 0.02 week.Keywords: accuration, actual cost, earn value, earn schedule,  planed value  ABSTRAKMetode nilai hasil (EVM) telah dikenal luas dan terbukti mampu memberikan gambaran kinerja pelaksanaan proyek konstruksi dari aspek waktu dan jadwal. Secara khusus EVM digunakan untuk mengevaluasi progress pekerjaan sehingga dapat dilakukan identifikasi lebih awal terhadap penyimpangan baik terhadap waktu maupun biaya. Metode Earn Schedule (ES) merupakan pendalaman terhadap analisis jadwal pada metode EVM. Penelitian ini dilakukan untuk menguji dan membandingkan kemampuan dua metode yaitu metode earn value dan earn schedule dalam memprediksi waktu penyelesaian proyek konstruksi. Data penelitian menggunakan data pelaksanaan dari pembangunan proyek bangunan gedung di Unesa. Hasil penelitianmenunjukkan bahwa pada minggu ke-9, nilai CPI adalah sebesar 1,15 atau memiliki varian biaya sebesar 13,32% lebih rendah dari anggaran yang direncanakan. Sedangkan dari aspek jadwal, kedua metode mengindikasikan bahwa terjadi keterlambatan pada proyek yaitu dengan varian keterlambatan sebesar 0,16% . Metode ES mampu memberikan informasi berapa lama keterlambatan yang terjadi dalam satuan waktu yaitu sebesar 0,02 minggu. Kata Kunci: akurasi, biaya aktual, nilai hasil, earn schedule, biaya rencana\",\"PeriodicalId\":440737,\"journal\":{\"name\":\"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21831/INERSIA.V14I2.22539\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21831/INERSIA.V14I2.22539","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

挣值法(EVM)已被广泛认可并证明可以从时间和进度方面对建设项目实施的绩效进行概述。具体来说,EVM用于评估工作的进度,因此可以尽早识别时间和成本上的偏差。获得进度(ES)方法是在EVM方法的基础上对进度分析的一种细化。本研究旨在检验和比较收益值法和收益进度法两种方法在预测建设项目完工时间方面的能力。该研究使用了Unesa建筑项目的真实数据。结果表明,在第9周,CPI值为1.15或变量成本比计划预算低13.32%。而在进度方面,两种方法都表明项目延迟,延迟变量为0.16%。ES方法能够给出延迟多长时间的信息,时间单位为0.02周。【关键词】精度、实际成本、盈利价值、盈利进度、计划价值Secara khusus EVM digunakan untuk mengevaluasprogress pekerjaan sehinga dapat dilakukan identifikasi lebih awal terhadap penyimpangan baik terhadap waktu maupun biaya。方法挣得表(ES)是一种基于方法挣得表分析的方法。Penelitian ini dilakukan untuk menguji dan membandingkan kemampuan dua method yitu method赚取价值和赚取时间表dalam memprediksi waktu penyelesan proyek konstruksi。Data penelitian menggunakan Data pelaksanaan dari pembangunan proyek bangunan gedung di Unesa。Hasil penelitianmenunjukkan bahwa pada minggu ke-9, nilai CPI adalah sebesar 1,15 atau memiliki varian biaya sebesar 13,32 lebih rendah dari anggaran yang direncanakan。Sedangkan dari说jadwal, kedua mede mengindikasikan bahwa terjadi keterlambatan pada proyek yitu dengan varian keterlambatan sebesar 0,16%。Metode ES mampu成员:berapa lama keterlambatan yang terjadi dalam satuan waktu yaitu sebesar, 2002。Kata Kunci: akurasi, biaya aktual, nilai hasil,赚取时间表,biaya rencana
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
AKURASI PREDIKSI DURASI PENYELESAIAN PROYEK DENGAN EARN VALUE MANAGEMENT DAN EARN SCHEDULE (STUDI KASUS PROYEK BANGUNAN GEDUNG DI UNESA)
ABSTRACT The earn value method (EVM) has been widely recognized and proven to provide an overview of the performance of construction project implementation from the aspects of time and schedule. Specifically EVM is used to evaluate the progress of the work, so identification of deviations both on time and cost can be done early.The Earn Schedule (ES) method is an elaboration to the schedule analysis on the EVM method. This study aimed to examine and compare the capability of the two methods, namely the earn value and earn schedule methods in predicting the completion time of construction project. The research used the real data from the Unesa building project. The results showed that at week 9, the value of CPI was 1.15 or had a variant cost of 13.32% lower than the planned budget. While for the schedule aspect, both methods indicated a delay in the project with the delay variant of 0.16%. The ES method is able to give information of how long the delay in time unit of 0.02 week.Keywords: accuration, actual cost, earn value, earn schedule,  planed value  ABSTRAKMetode nilai hasil (EVM) telah dikenal luas dan terbukti mampu memberikan gambaran kinerja pelaksanaan proyek konstruksi dari aspek waktu dan jadwal. Secara khusus EVM digunakan untuk mengevaluasi progress pekerjaan sehingga dapat dilakukan identifikasi lebih awal terhadap penyimpangan baik terhadap waktu maupun biaya. Metode Earn Schedule (ES) merupakan pendalaman terhadap analisis jadwal pada metode EVM. Penelitian ini dilakukan untuk menguji dan membandingkan kemampuan dua metode yaitu metode earn value dan earn schedule dalam memprediksi waktu penyelesaian proyek konstruksi. Data penelitian menggunakan data pelaksanaan dari pembangunan proyek bangunan gedung di Unesa. Hasil penelitianmenunjukkan bahwa pada minggu ke-9, nilai CPI adalah sebesar 1,15 atau memiliki varian biaya sebesar 13,32% lebih rendah dari anggaran yang direncanakan. Sedangkan dari aspek jadwal, kedua metode mengindikasikan bahwa terjadi keterlambatan pada proyek yaitu dengan varian keterlambatan sebesar 0,16% . Metode ES mampu memberikan informasi berapa lama keterlambatan yang terjadi dalam satuan waktu yaitu sebesar 0,02 minggu. Kata Kunci: akurasi, biaya aktual, nilai hasil, earn schedule, biaya rencana
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Balok Beton Bertulang yang Diperkuat dengan Carbon Fiber Reinforced Polymer Wrap saat Dibebani Beban Gravitasi Analisis Potensi Likuefaksi dan Perbaikan Tanah dengan Stone Column: Studi Kasus pada Coal Shelter PLTU Lontar, Banten Usaha Peningkatan Daya Dukung Tanah Lempung Menggunakan Layer Krikil, Anyaman Bambu dan Kombinasi Kolom-Layer Pasir PERANCANGAN FONDASI GEDUNG TEMPORARY EVACUATION SHELTER (TES) TSUNAMI DAN GEMPA ANALISIS PENURUNAN KUALITAS MUTU KAYU PADA BANGUNAN CAGAR BUDAYA DENGAN METODE NON DESTRUCTIVE TEST (Studi Kasus Bangunan Cagar Budaya Masjid Gedhe Mataram Daerah Istimewa Yogyakarta)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1