E. N. Desyatirikova, O. Minakova, A. S. Golikov, L. Chernenkaya, Yu. V. Khripunov
{"title":"基于项目的学习任务监控软件","authors":"E. N. Desyatirikova, O. Minakova, A. S. Golikov, L. Chernenkaya, Yu. V. Khripunov","doi":"10.1109/CTS53513.2021.9562785","DOIUrl":null,"url":null,"abstract":"The complex task of control of multiple configurations of documents, diagrams and code in the student projects in e-learning process requires a project management software tools. This paper presents the developed technology for managing course design, based on a sequential workflow and registration of the states of its stages. The design of a software tool that implements the proposed approach, data model and technical solutions used in the implementation is described. The flexibility of the developed tool is achieved by specifying a list of project stages and states in a local database. Change management is supported by the formation of a chain of messages, version control is based on sequential numbering and is fully automated.","PeriodicalId":371882,"journal":{"name":"2021 IV International Conference on Control in Technical Systems (CTS)","volume":"596 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Monitoring Software for Project Based Learning Tasks\",\"authors\":\"E. N. Desyatirikova, O. Minakova, A. S. Golikov, L. Chernenkaya, Yu. V. Khripunov\",\"doi\":\"10.1109/CTS53513.2021.9562785\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The complex task of control of multiple configurations of documents, diagrams and code in the student projects in e-learning process requires a project management software tools. This paper presents the developed technology for managing course design, based on a sequential workflow and registration of the states of its stages. The design of a software tool that implements the proposed approach, data model and technical solutions used in the implementation is described. The flexibility of the developed tool is achieved by specifying a list of project stages and states in a local database. Change management is supported by the formation of a chain of messages, version control is based on sequential numbering and is fully automated.\",\"PeriodicalId\":371882,\"journal\":{\"name\":\"2021 IV International Conference on Control in Technical Systems (CTS)\",\"volume\":\"596 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IV International Conference on Control in Technical Systems (CTS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CTS53513.2021.9562785\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IV International Conference on Control in Technical Systems (CTS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CTS53513.2021.9562785","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Monitoring Software for Project Based Learning Tasks
The complex task of control of multiple configurations of documents, diagrams and code in the student projects in e-learning process requires a project management software tools. This paper presents the developed technology for managing course design, based on a sequential workflow and registration of the states of its stages. The design of a software tool that implements the proposed approach, data model and technical solutions used in the implementation is described. The flexibility of the developed tool is achieved by specifying a list of project stages and states in a local database. Change management is supported by the formation of a chain of messages, version control is based on sequential numbering and is fully automated.