{"title":"基于Digsilent app的转发系统的电压下降","authors":"Raka Trialviano Bagus, Denny Irawan","doi":"10.31851/ampere.v8i1.11635","DOIUrl":null,"url":null,"abstract":"The electrical quality, especially voltage fluctuations, is very important to remain stable in supplying voltage to consumers. PT. PLN (Persero) has a minimum voltage limit of -5% and a maximum of +10% which is regulated in the Minister of Energy and Mineral Resources no. 3 of 2007 in the transmission system. However, the 150 KV transmission system often experiences voltage drops caused by conductors that are too long and inappropriate loads, so that in maintaining good transmission quality, a reliable system is needed. One of them is GI Cerme which has a double busbar type, which separates the two Java-Bali transmission sub-systems and is connected to supplies from West Surabaya GI and Lamongan GI. Even so, the Lamongan-Cerme network with a length of 26.77KMS and transformer load causes a voltage drop, in the case that occurred in April 2023 at GI Cerme at peak load it experienced a voltage drop of up to 137 KV, so it is necessary to overcome the voltage drop problem the transmission system was repaired at GI Cerme. Through the digsilent application, it is possible to simulate better system planning at GI Cerme so that the voltage can be repaired according to standards.","PeriodicalId":404492,"journal":{"name":"Jurnal Ampere","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Perbaikan Jatuh Tegangan Pada Sistem Transmisi 150kV Gardu Induk Cerme Menggunakan Aplikasi Digsilent\",\"authors\":\"Raka Trialviano Bagus, Denny Irawan\",\"doi\":\"10.31851/ampere.v8i1.11635\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The electrical quality, especially voltage fluctuations, is very important to remain stable in supplying voltage to consumers. PT. PLN (Persero) has a minimum voltage limit of -5% and a maximum of +10% which is regulated in the Minister of Energy and Mineral Resources no. 3 of 2007 in the transmission system. However, the 150 KV transmission system often experiences voltage drops caused by conductors that are too long and inappropriate loads, so that in maintaining good transmission quality, a reliable system is needed. One of them is GI Cerme which has a double busbar type, which separates the two Java-Bali transmission sub-systems and is connected to supplies from West Surabaya GI and Lamongan GI. Even so, the Lamongan-Cerme network with a length of 26.77KMS and transformer load causes a voltage drop, in the case that occurred in April 2023 at GI Cerme at peak load it experienced a voltage drop of up to 137 KV, so it is necessary to overcome the voltage drop problem the transmission system was repaired at GI Cerme. Through the digsilent application, it is possible to simulate better system planning at GI Cerme so that the voltage can be repaired according to standards.\",\"PeriodicalId\":404492,\"journal\":{\"name\":\"Jurnal Ampere\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ampere\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31851/ampere.v8i1.11635\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ampere","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31851/ampere.v8i1.11635","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电能质量,特别是电压波动,是保证用户电压稳定的重要因素。PT. PLN (Persero)的最低电压限制为-5%,最高电压限制为+10%,由能源和矿产资源部长no. 5规定。在传输系统中发现的。但是,在150 KV输电系统中,由于导线过长、负载不合适等原因,经常出现电压下降,因此要保持良好的输电质量,就需要可靠的输电系统。其中之一是GI Cerme,它具有双母线类型,将两个爪哇-巴厘岛传输子系统分开,并连接到西泗水GI和拉蒙干GI的供应。尽管如此,长度为26.77KMS的拉蒙甘-塞姆电网和变压器负载会造成电压下降,在2023年4月发生在GI Cerme的峰值负荷情况下,电压下降高达137 KV,因此有必要克服电压下降问题,在GI Cerme进行输电系统维修。通过该软件的应用,可以更好地模拟GI Cerme的系统规划,从而使电压能够按照标准进行修复。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis Perbaikan Jatuh Tegangan Pada Sistem Transmisi 150kV Gardu Induk Cerme Menggunakan Aplikasi Digsilent
The electrical quality, especially voltage fluctuations, is very important to remain stable in supplying voltage to consumers. PT. PLN (Persero) has a minimum voltage limit of -5% and a maximum of +10% which is regulated in the Minister of Energy and Mineral Resources no. 3 of 2007 in the transmission system. However, the 150 KV transmission system often experiences voltage drops caused by conductors that are too long and inappropriate loads, so that in maintaining good transmission quality, a reliable system is needed. One of them is GI Cerme which has a double busbar type, which separates the two Java-Bali transmission sub-systems and is connected to supplies from West Surabaya GI and Lamongan GI. Even so, the Lamongan-Cerme network with a length of 26.77KMS and transformer load causes a voltage drop, in the case that occurred in April 2023 at GI Cerme at peak load it experienced a voltage drop of up to 137 KV, so it is necessary to overcome the voltage drop problem the transmission system was repaired at GI Cerme. Through the digsilent application, it is possible to simulate better system planning at GI Cerme so that the voltage can be repaired according to standards.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengendali Kecepatan Motor DC Terhadap Perubahan Suhu Menggunakan PLC dan Human Machine Interface Analisis Kinerja PLTS 200WP Secara Realtime Menggunakan IoT Efisiensi Penggunaan Daya Listrik Di Hotel Carrissima Palembang Smart Home Menggunakan PLC Outseal Berbasis Internet Of Things Perancangan Software Impedansi Total Sistem Rangkaian Listrik Menggunakan Metode Gabriel Kron
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1