基于IEC 62439-3的PRP拓扑的两个互联高压变电站性能评价

Shantanu Kumar, N. Das, S. Islam
{"title":"基于IEC 62439-3的PRP拓扑的两个互联高压变电站性能评价","authors":"Shantanu Kumar, N. Das, S. Islam","doi":"10.1109/AUPEC.2017.8282401","DOIUrl":null,"url":null,"abstract":"In a modern power system network having multiple interconnected High Voltage (HV) substations, communication amongst Intelligent Electronic Devices (IED) becomes an important feature in an automation system. Time critical information, such as feeder faults, overcurrent, under frequency messages between multiple geographically isolated substations have opened up number of issues related to reliability in protection, automation and control. There are problems related to latency, data loss and transfer of Sampled Value (SV) packets transmitted to these inter-connected substations on radio wireless and Ethernet mode linked up in a Wide Area Network (WAN) configuration. Few other key area of concerns in a digital protection scheme are packet losses, errors in packet arrival at destination, latency in transmission, End to End delay in packet transfer due to flooding of the network, out of sequence packet arrival etc. Error prone packets could seriously compromise the protection scheme and endanger the safety of primary plant assets in a transmission substation. This paper investigates performance of SV packet transmission between two interconnected substations]. Practical simulations were performed to evaluate the performance of SV packets in a laboratory set up to assess the performance of digital protection scheme based on Parallel Redundancy Protocol (PRP) topology involving digital equipment such as Merger Units (MUs), switches, IEDs and Redundant boxes (Red box), etc.","PeriodicalId":155608,"journal":{"name":"2017 Australasian Universities Power Engineering Conference (AUPEC)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Performance evaluation of two interconnected high voltage utility substations using PRP topology based on IEC 62439-3\",\"authors\":\"Shantanu Kumar, N. Das, S. Islam\",\"doi\":\"10.1109/AUPEC.2017.8282401\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a modern power system network having multiple interconnected High Voltage (HV) substations, communication amongst Intelligent Electronic Devices (IED) becomes an important feature in an automation system. Time critical information, such as feeder faults, overcurrent, under frequency messages between multiple geographically isolated substations have opened up number of issues related to reliability in protection, automation and control. There are problems related to latency, data loss and transfer of Sampled Value (SV) packets transmitted to these inter-connected substations on radio wireless and Ethernet mode linked up in a Wide Area Network (WAN) configuration. Few other key area of concerns in a digital protection scheme are packet losses, errors in packet arrival at destination, latency in transmission, End to End delay in packet transfer due to flooding of the network, out of sequence packet arrival etc. Error prone packets could seriously compromise the protection scheme and endanger the safety of primary plant assets in a transmission substation. This paper investigates performance of SV packet transmission between two interconnected substations]. Practical simulations were performed to evaluate the performance of SV packets in a laboratory set up to assess the performance of digital protection scheme based on Parallel Redundancy Protocol (PRP) topology involving digital equipment such as Merger Units (MUs), switches, IEDs and Redundant boxes (Red box), etc.\",\"PeriodicalId\":155608,\"journal\":{\"name\":\"2017 Australasian Universities Power Engineering Conference (AUPEC)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 Australasian Universities Power Engineering Conference (AUPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUPEC.2017.8282401\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Australasian Universities Power Engineering Conference (AUPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUPEC.2017.8282401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在由多个相互连接的高压变电站组成的现代电力系统网络中,智能电子设备(IED)之间的通信成为自动化系统的重要特征。时间关键信息,如馈线故障、过流、多个地理上隔离的变电站之间的低频信息,已经提出了许多与保护、自动化和控制可靠性有关的问题。在广域网(WAN)配置中,通过无线电、无线和以太网模式将采样值(SV)数据包传输到这些相互连接的变电站,存在与延迟、数据丢失和传输相关的问题。在数字保护方案中,其他几个关键的问题是数据包丢失、数据包到达目的地时的错误、传输中的延迟、由于网络泛滥而导致的数据包传输的端到端延迟、数据包到达的乱序等。易出错的数据包会严重破坏变电站的保护方案,危及变电站主设备的安全。本文研究了两个相互连接的变电站之间SV分组传输的性能。为了评估基于并行冗余协议(PRP)拓扑的数字保护方案的性能,对合并单元(MUs)、交换机、ied和冗余盒(Red box)等数字设备进行了实际仿真。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Performance evaluation of two interconnected high voltage utility substations using PRP topology based on IEC 62439-3
In a modern power system network having multiple interconnected High Voltage (HV) substations, communication amongst Intelligent Electronic Devices (IED) becomes an important feature in an automation system. Time critical information, such as feeder faults, overcurrent, under frequency messages between multiple geographically isolated substations have opened up number of issues related to reliability in protection, automation and control. There are problems related to latency, data loss and transfer of Sampled Value (SV) packets transmitted to these inter-connected substations on radio wireless and Ethernet mode linked up in a Wide Area Network (WAN) configuration. Few other key area of concerns in a digital protection scheme are packet losses, errors in packet arrival at destination, latency in transmission, End to End delay in packet transfer due to flooding of the network, out of sequence packet arrival etc. Error prone packets could seriously compromise the protection scheme and endanger the safety of primary plant assets in a transmission substation. This paper investigates performance of SV packet transmission between two interconnected substations]. Practical simulations were performed to evaluate the performance of SV packets in a laboratory set up to assess the performance of digital protection scheme based on Parallel Redundancy Protocol (PRP) topology involving digital equipment such as Merger Units (MUs), switches, IEDs and Redundant boxes (Red box), etc.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effect of automatic hyperparameter tuning for residential load forecasting via deep learning Hybrid power plant bidding strategy including a commercial compressed air energy storage aggregator and a wind power producer Modeling of multi-junction solar cells for maximum power point tracking to improve the conversion efficiency The importance of lightning education and a lightning protection risk assessment to reduce fatalities Recent advances in common mode voltage mitigation techniques based on MPC
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1