{"title":"三维模型在建筑生产系统中的应用","authors":"Keizo Kanzaki","doi":"10.34257/gjreevol20is2pg1","DOIUrl":null,"url":null,"abstract":"The quitting a job of the expert worker and the lack of the technical transmission to the young worker with low birthrate, and the deterioration of the infrastructure institution which will increase rapidly in future will be the problem that must put up measures immediately in the construction business. CIM and i-Construction proposed by Ministry of Land, Infrastructure, Transport and Tourism enforce the improvement of the productivity of the construction site and the maintenance and check for the life cycle of the structure using three-dimensional model in order to solve such a problem, and they may be said that it is the big change of the construction production system. In this report, I survey three examples of the tool which I can utilize three-dimensional model for plan, measuring, construction, and maintenance based on a policy of CIM and i-Construction, explain an effective making method of the three-dimensional model suitable for a construction scale and contents and examine the effective utilization method and introduction effect in the construction production system.","PeriodicalId":342934,"journal":{"name":"Global Journal of Researches in Engineering","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Utilization of the Three-Dimensional Model to a Construction Production System\",\"authors\":\"Keizo Kanzaki\",\"doi\":\"10.34257/gjreevol20is2pg1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quitting a job of the expert worker and the lack of the technical transmission to the young worker with low birthrate, and the deterioration of the infrastructure institution which will increase rapidly in future will be the problem that must put up measures immediately in the construction business. CIM and i-Construction proposed by Ministry of Land, Infrastructure, Transport and Tourism enforce the improvement of the productivity of the construction site and the maintenance and check for the life cycle of the structure using three-dimensional model in order to solve such a problem, and they may be said that it is the big change of the construction production system. In this report, I survey three examples of the tool which I can utilize three-dimensional model for plan, measuring, construction, and maintenance based on a policy of CIM and i-Construction, explain an effective making method of the three-dimensional model suitable for a construction scale and contents and examine the effective utilization method and introduction effect in the construction production system.\",\"PeriodicalId\":342934,\"journal\":{\"name\":\"Global Journal of Researches in Engineering\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Global Journal of Researches in Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34257/gjreevol20is2pg1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Researches in Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34257/gjreevol20is2pg1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Utilization of the Three-Dimensional Model to a Construction Production System
The quitting a job of the expert worker and the lack of the technical transmission to the young worker with low birthrate, and the deterioration of the infrastructure institution which will increase rapidly in future will be the problem that must put up measures immediately in the construction business. CIM and i-Construction proposed by Ministry of Land, Infrastructure, Transport and Tourism enforce the improvement of the productivity of the construction site and the maintenance and check for the life cycle of the structure using three-dimensional model in order to solve such a problem, and they may be said that it is the big change of the construction production system. In this report, I survey three examples of the tool which I can utilize three-dimensional model for plan, measuring, construction, and maintenance based on a policy of CIM and i-Construction, explain an effective making method of the three-dimensional model suitable for a construction scale and contents and examine the effective utilization method and introduction effect in the construction production system.