{"title":"邻近不连通桩筏的深基坑开挖:风险控制实践综述","authors":"Bantayehu Uba Uge, Y. Guo","doi":"10.4236/ojce.2020.103023","DOIUrl":null,"url":null,"abstract":"Foundation \npit excavation engineering is an old subject full of decision making. Yet, it \nstill deserves further research due to the associated high failure cost and the \ncomplexity of the geological conditions and/or the surrounding existing \ninfrastructure around it. This article overviews the risk control practice of \nfoundation pit excavation projects in close proximity to existing disconnected piled raft. More focus is \ngiven to geotechnical aspects. The review begins with achievements to ensure \nexcavation performance requirements, and \nfollows to discuss the complex soil structure interaction involved among the fundamental components: the \nretaining wall, mat, piles, cushion, and the soil. After bringing consensus \npoints to practicing engineers and decision \nmakers, it then suggests possible future research directions.","PeriodicalId":302856,"journal":{"name":"Open Journal of Civil Engineering","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Deep Foundation Pit Excavations Adjacent to Disconnected Piled Rafts: A Review on Risk Control Practice\",\"authors\":\"Bantayehu Uba Uge, Y. Guo\",\"doi\":\"10.4236/ojce.2020.103023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Foundation \\npit excavation engineering is an old subject full of decision making. Yet, it \\nstill deserves further research due to the associated high failure cost and the \\ncomplexity of the geological conditions and/or the surrounding existing \\ninfrastructure around it. This article overviews the risk control practice of \\nfoundation pit excavation projects in close proximity to existing disconnected piled raft. More focus is \\ngiven to geotechnical aspects. The review begins with achievements to ensure \\nexcavation performance requirements, and \\nfollows to discuss the complex soil structure interaction involved among the fundamental components: the \\nretaining wall, mat, piles, cushion, and the soil. After bringing consensus \\npoints to practicing engineers and decision \\nmakers, it then suggests possible future research directions.\",\"PeriodicalId\":302856,\"journal\":{\"name\":\"Open Journal of Civil Engineering\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Open Journal of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4236/ojce.2020.103023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/ojce.2020.103023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

基坑开挖工程是一门充满决策的古老学科。然而,由于相关的高破坏成本以及地质条件和/或周围现有基础设施的复杂性,它仍然值得进一步研究。本文综述了现有断桩筏附近基坑开挖工程的风险控制实践。更多的重点放在岩土方面。回顾从确保开挖性能要求的成就开始,然后讨论复杂的土结构相互作用,涉及基本组成部分:挡土墙、垫层、桩、垫层和土壤。在向实践工程师和决策者提出共识点后,然后提出可能的未来研究方向。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Deep Foundation Pit Excavations Adjacent to Disconnected Piled Rafts: A Review on Risk Control Practice
Foundation pit excavation engineering is an old subject full of decision making. Yet, it still deserves further research due to the associated high failure cost and the complexity of the geological conditions and/or the surrounding existing infrastructure around it. This article overviews the risk control practice of foundation pit excavation projects in close proximity to existing disconnected piled raft. More focus is given to geotechnical aspects. The review begins with achievements to ensure excavation performance requirements, and follows to discuss the complex soil structure interaction involved among the fundamental components: the retaining wall, mat, piles, cushion, and the soil. After bringing consensus points to practicing engineers and decision makers, it then suggests possible future research directions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Interchange Sight Distance and Design: Aspects and Implementation A Slip-Force Device for Maintaining Constant Lateral Pressure on Retaining Structures in Expansive Soils Practical Engineering Behavior of Egyptian Collapsible Soils, Laboratory and In-Situ Experimental Study Structural Health Monitoring for Reinforced Concrete Containment Using Inner Electrical Resistivity Method Hardening Properties of Foamed Concrete with Circulating Fluidized Bed Boiler Ash, Blast Furnace Slag, and Desulfurization Gypsum as the Binder
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1