{"title":"需求驱动的,可迭代的容量分配和循环时间估计的重新进入线路","authors":"Shi-Chung Chang","doi":"10.1109/CDC.1999.831259","DOIUrl":null,"url":null,"abstract":"Daily production target setting for each production stage of a semiconductor wafer fabrication factory is a challenging machine capacity allocation problem due to the complex and re-entrant process flows. This paper summarizes a methodology developed by the author for the design of a daily target setting system over the past few years. The methodology realizes PULL-then-PUSH and proportional capacity allocation principles to meet production demands in a smooth way while maximizing machine utilization. As machine capacity allocation and available wafer flows are intertwined, the target setting problem can be viewed as a fixed-point iteration problem. A deterministic queueing analysis-based algorithm is designed to estimate cycle times and hence wafer flows. The methodology iterates between capacity allocation and cycle time estimation until a fixed-point capacity allocation is achieved.","PeriodicalId":137513,"journal":{"name":"Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Demand-driven, iterative capacity allocation and cycle time estimation for re-entrant lines\",\"authors\":\"Shi-Chung Chang\",\"doi\":\"10.1109/CDC.1999.831259\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Daily production target setting for each production stage of a semiconductor wafer fabrication factory is a challenging machine capacity allocation problem due to the complex and re-entrant process flows. This paper summarizes a methodology developed by the author for the design of a daily target setting system over the past few years. The methodology realizes PULL-then-PUSH and proportional capacity allocation principles to meet production demands in a smooth way while maximizing machine utilization. As machine capacity allocation and available wafer flows are intertwined, the target setting problem can be viewed as a fixed-point iteration problem. A deterministic queueing analysis-based algorithm is designed to estimate cycle times and hence wafer flows. The methodology iterates between capacity allocation and cycle time estimation until a fixed-point capacity allocation is achieved.\",\"PeriodicalId\":137513,\"journal\":{\"name\":\"Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDC.1999.831259\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1999.831259","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

由于半导体晶圆制造工厂的工艺流程复杂且具有重入性,因此对每个生产阶段的日生产目标设定是一个具有挑战性的机器产能分配问题。本文总结了作者在过去几年中为设计每日目标设定系统而开发的一种方法。该方法实现了先拉后推和按比例的产能分配原则,在满足生产需求的同时最大限度地提高了机器利用率。由于机器容量分配和可用晶圆流相互交织,目标设定问题可以看作是一个定点迭代问题。设计了一种基于确定性排队分析的算法来估计周期时间和晶圆流量。该方法在容量分配和周期时间估计之间迭代,直到实现定点容量分配。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Demand-driven, iterative capacity allocation and cycle time estimation for re-entrant lines
Daily production target setting for each production stage of a semiconductor wafer fabrication factory is a challenging machine capacity allocation problem due to the complex and re-entrant process flows. This paper summarizes a methodology developed by the author for the design of a daily target setting system over the past few years. The methodology realizes PULL-then-PUSH and proportional capacity allocation principles to meet production demands in a smooth way while maximizing machine utilization. As machine capacity allocation and available wafer flows are intertwined, the target setting problem can be viewed as a fixed-point iteration problem. A deterministic queueing analysis-based algorithm is designed to estimate cycle times and hence wafer flows. The methodology iterates between capacity allocation and cycle time estimation until a fixed-point capacity allocation is achieved.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A systematic and numerically efficient procedure for stable dynamic model inversion of LTI systems Controller design for improving the degree of stability of periodic solutions in forced nonlinear systems A Bayesian approach to the missing features problem in classification Stability analysis and systematic design of fuzzy controllers with simplified linear control rules Best linear unbiased estimation filters with FIR structures for state space signal models
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1