新南威尔士州地方政府的项目管理成熟度水平和组织收入

Austin Morris, S. Wilkinson, Chivonne Algeo, Damian Candusso
{"title":"新南威尔士州地方政府的项目管理成熟度水平和组织收入","authors":"Austin Morris, S. Wilkinson, Chivonne Algeo, Damian Candusso","doi":"10.19255/JMPM02413","DOIUrl":null,"url":null,"abstract":"Local government in New South Wales (NSW) is responsible for the delivery of a variety of projects, each with variable success measures.  Due to the variation in success indicators, measurement of project management maturity (process and procedures) was sought.  An industry specific project management maturity model was used to assess maturity levels.  Using a mixed-methods approach, the project management maturity levels of NSW local government were determined.  Correlation analysis was used to determine that maturity and organizational revenue are related.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Project management maturity levels and organizational revenue in New South Wales local government\",\"authors\":\"Austin Morris, S. Wilkinson, Chivonne Algeo, Damian Candusso\",\"doi\":\"10.19255/JMPM02413\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Local government in New South Wales (NSW) is responsible for the delivery of a variety of projects, each with variable success measures.  Due to the variation in success indicators, measurement of project management maturity (process and procedures) was sought.  An industry specific project management maturity model was used to assess maturity levels.  Using a mixed-methods approach, the project management maturity levels of NSW local government were determined.  Correlation analysis was used to determine that maturity and organizational revenue are related.\",\"PeriodicalId\":320094,\"journal\":{\"name\":\"The Journal of Modern Project Management\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Modern Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19255/JMPM02413\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02413","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

新南威尔士州(NSW)的地方政府负责交付各种项目,每个项目都有不同的成功措施。由于成功指标的变化,需要对项目管理成熟度(过程和程序)进行度量。一个行业特定的项目管理成熟度模型被用来评估成熟度水平。采用混合方法,确定了新南威尔士州地方政府的项目管理成熟度水平。通过相关分析确定成熟度与组织收益之间存在相关性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Project management maturity levels and organizational revenue in New South Wales local government
Local government in New South Wales (NSW) is responsible for the delivery of a variety of projects, each with variable success measures.  Due to the variation in success indicators, measurement of project management maturity (process and procedures) was sought.  An industry specific project management maturity model was used to assess maturity levels.  Using a mixed-methods approach, the project management maturity levels of NSW local government were determined.  Correlation analysis was used to determine that maturity and organizational revenue are related.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Project recovery: Project failures and how to get rid of them Agile Enhancement of Critical PMBoK v6 Processes Whole Life Program Success, Leadership Competencies and Motivation for Learning – UK Defence Case Project Resource Optimization Considering Labor Productivity Factors Service based framework of research projects in higher education institutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1