在BG&E实施自动化采购工程

K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor
{"title":"在BG&E实施自动化采购工程","authors":"K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor","doi":"10.1109/NSSMIC.1992.301421","DOIUrl":null,"url":null,"abstract":"Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<<ETX>>","PeriodicalId":447239,"journal":{"name":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementing automated procurement engineering at BG&E\",\"authors\":\"K.B. Cellars, J. Spina, M.A. Elzey, E. F. McGinn, M. Winsor\",\"doi\":\"10.1109/NSSMIC.1992.301421\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<<ETX>>\",\"PeriodicalId\":447239,\"journal\":{\"name\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Conference on Nuclear Science Symposium and Medical Imaging\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NSSMIC.1992.301421\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference on Nuclear Science Symposium and Medical Imaging","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NSSMIC.1992.301421","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了巴尔的摩燃气和电气公司(BG&E)实施自动化采购工程流程的方法。该过程强调部件安全分类、采购规范和仓库描述标准化,以及有限数量的最频繁采购的部件(与安全相关的系统、结构和组件的库存替换项目)。对1万多件库存物品进行逻辑分组后,通过基于个人电脑的计算机应用程序将其合并为275项自动采购规范。这种自动化带来了以下成本效益:减少了采购工程人员,减少了采购请求积压,减少了投标例外/偏差的数量,并消除了重复的库存物品
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Implementing automated procurement engineering at BG&E
Baltimore Gas and Electric's (BG&E's) approach to implementing an automated procurement engineering process is presented. The process emphasizes part safety classification, procurement specification, and warehouse description standardization, of a limited population of the most frequently procured parts (stocked replacement items for safety-related systems, structures, and components). Logical grouping of over 10000 stock items resulted in consolidation to 275 automated procurement specifications maintained through a PC-based computer application. This automation has resulted in the following cost benefits: reduced procurement engineering staff, reduced procurement request backlog, reduced volume of bid exceptions/deviations, and elimination of duplicate stocked items.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Results in online data processing in the data acquisition system of the ALEPH TPC Practical evaluation of several cone beam orbits for SPECT Model based scatter correction in three dimensions (positron emission tomography) Macintosh software for simulating resolution and scatter effects in PET Testing fast ADC's at sample rates between 20 and 140 MSPS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1