{"title":"具有单一不可再生资源的多模式项目调度问题的分支定界算法","authors":"Cansu Altintas, M. Azizoglu","doi":"10.4018/ijitpm.2020040101","DOIUrl":null,"url":null,"abstract":"In this paper, a project scheduling problem with multi-modes and a single non-renewable resource is considered. The resource is released in pre-specified times at pre-specified quantities. An activity can be executed at different modes where a mode is defined by a processing time and a resource requirement amount. The objective is to minimize the project completion time. A branch and bound algorithm that enumerates the partial solutions based on the mode assignment decisions is presented. The results of the experiments have revealed that the branch and bound algorithm can solve problem instances with up to 100 activities in reasonable times.","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A Branch and Bound Algorithm for a Multi-Mode Project Scheduling Problem With a Single Non-Renewable Resource\",\"authors\":\"Cansu Altintas, M. Azizoglu\",\"doi\":\"10.4018/ijitpm.2020040101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a project scheduling problem with multi-modes and a single non-renewable resource is considered. The resource is released in pre-specified times at pre-specified quantities. An activity can be executed at different modes where a mode is defined by a processing time and a resource requirement amount. The objective is to minimize the project completion time. A branch and bound algorithm that enumerates the partial solutions based on the mode assignment decisions is presented. The results of the experiments have revealed that the branch and bound algorithm can solve problem instances with up to 100 activities in reasonable times.\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":\"60 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijitpm.2020040101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijitpm.2020040101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

研究了一个多模式、单一不可再生资源的项目调度问题。资源在预定的时间以预定的数量释放。活动可以在不同的模式下执行,其中模式由处理时间和资源需求数量定义。目标是最小化项目完成时间。提出了一种基于模式分配决策枚举部分解的分支定界算法。实验结果表明,分支定界算法可以在合理的时间内解决多达100个活动的问题实例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Branch and Bound Algorithm for a Multi-Mode Project Scheduling Problem With a Single Non-Renewable Resource
In this paper, a project scheduling problem with multi-modes and a single non-renewable resource is considered. The resource is released in pre-specified times at pre-specified quantities. An activity can be executed at different modes where a mode is defined by a processing time and a resource requirement amount. The objective is to minimize the project completion time. A branch and bound algorithm that enumerates the partial solutions based on the mode assignment decisions is presented. The results of the experiments have revealed that the branch and bound algorithm can solve problem instances with up to 100 activities in reasonable times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Adapting P2M Framework for Innovation Program Management Through a Lean-Agile Approach Mining Project Failure Indicators From Big Data Using Machine Learning Mixed Methods A Proposal for Research on the Application of AI/ML in ITPM: Intelligent Project Management "Soar" or "Sore": Examining and Reflecting on Bank Performance During Global Financial Crisis - An Indian Scenario FDI Inflow in BRICS and G7: An Empirical Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1