{"title":"成本规划和执行方法在亚齐县正门入口入口","authors":"F. Bakrie","doi":"10.30811/portal.v8i2.608","DOIUrl":null,"url":null,"abstract":"Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction and Implementation Method road is a basic reference in the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation","PeriodicalId":378653,"journal":{"name":"Portal: Jurnal Teknik Sipil","volume":"155 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"PERENCANAAN BIAYA DAN METODE PELAKSANAAN PADA JALAN PAMEU-GENTING GERBANG KABUPATEN ACEH TENGAH\",\"authors\":\"F. Bakrie\",\"doi\":\"10.30811/portal.v8i2.608\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction and Implementation Method road is a basic reference in the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation\",\"PeriodicalId\":378653,\"journal\":{\"name\":\"Portal: Jurnal Teknik Sipil\",\"volume\":\"155 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Portal: Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30811/portal.v8i2.608\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Portal: Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30811/portal.v8i2.608","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
摘要
成本规划是对工程实施过程中有关材料、人工、设备和费用等必要费用进行规划计算的若干项费用。建设实施方法道路是标准公路实施道路建设的基本参考,适用于帕墨—云顶门公路,从sta45 + 850 s I d 49 + 500开始。预算计划的计算包括作业层底层(LPB)骨料B,工程层堆积(LPA)骨料A,(底漆),工程层粘结剂AC-BC和层Aus AC-WC(表面)。使用的方法是估算方法指数(E.l) Highways, 2010。从计算结果中得出,执行时间为166个工作日,Base Aggregate Base Layer B的费用共计Rp.4。032.876, 00 -。顶层集料基础成本合计Rp.3.376.312,816.50, -。吸收Rp. 122,801,512.50粘结剂层的费用,- Rp. 4的AC-BC(表面)之间的层的费用。732.319.951.10, - AC-WC Aus层费用Rp.2.331.857.250.00,合计预算为Rp. 14,752,380,906.00, - 10%的增值税,以及使用S曲线调度执行时间。本工程采用的实施方法包括作业层基层骨料B、层堆砌骨料A、(底漆)、层粘结剂AC-BC和AC-WC(表面)的成本,以计划为基础,系统、准确、有效、高效。关键词:预算计划,S曲线,实施方法
PERENCANAAN BIAYA DAN METODE PELAKSANAAN PADA JALAN PAMEU-GENTING GERBANG KABUPATEN ACEH TENGAH
Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction and Implementation Method road is a basic reference in the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation