国家公路项目初始建设后每5年进行一次覆盖层需求评估的调查研究:一个案例研究

A. Sandra
{"title":"国家公路项目初始建设后每5年进行一次覆盖层需求评估的调查研究:一个案例研究","authors":"A. Sandra","doi":"10.1504/ijfe.2019.10028380","DOIUrl":null,"url":null,"abstract":"The maintenance schedule of the concession agreement made for construction of the National Highway projects in India under built operate transfer (BOT) Toll basis says that the pavement need to be overlaid whenever the performance indicators such as Roughness or Benkelman beam deflections (BBDs) exceed the trigger value or when the age of the pavement is more than five years. Due to improved quality in construction and good maintenance practices followed during service life, many roads are performing well even after five years of the construction and their performance indicators are below the trigger value and do not warrant for an overlay. Nevertheless, the concession agreements demand the overlay irrespective of the condition of pavement which is wastage of natural resources. With this background, in the present study, a five years road section from Ambala - Chandigarh of NH-22 was taken as a case study and studied various parameters which affect the pavement performance. Based on the study, it is concluded that the selected pavement for study is performing better ever after five years and overlay is not required immediately.","PeriodicalId":443235,"journal":{"name":"International Journal of Forensic Engineering","volume":"149 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigations to assess the requirement of overlay every 5th year after initial construction on national highway projects: a case study\",\"authors\":\"A. Sandra\",\"doi\":\"10.1504/ijfe.2019.10028380\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The maintenance schedule of the concession agreement made for construction of the National Highway projects in India under built operate transfer (BOT) Toll basis says that the pavement need to be overlaid whenever the performance indicators such as Roughness or Benkelman beam deflections (BBDs) exceed the trigger value or when the age of the pavement is more than five years. Due to improved quality in construction and good maintenance practices followed during service life, many roads are performing well even after five years of the construction and their performance indicators are below the trigger value and do not warrant for an overlay. Nevertheless, the concession agreements demand the overlay irrespective of the condition of pavement which is wastage of natural resources. With this background, in the present study, a five years road section from Ambala - Chandigarh of NH-22 was taken as a case study and studied various parameters which affect the pavement performance. Based on the study, it is concluded that the selected pavement for study is performing better ever after five years and overlay is not required immediately.\",\"PeriodicalId\":443235,\"journal\":{\"name\":\"International Journal of Forensic Engineering\",\"volume\":\"149 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Forensic Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijfe.2019.10028380\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Forensic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijfe.2019.10028380","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为建设印度在建运营转让(BOT)收费基础的国家公路项目而制定的特许协议的维护计划表明,每当粗糙度或本克尔曼梁挠度(bbd)等性能指标超过触发值或路面年龄超过五年时,就需要覆盖路面。由于施工质量的提高和在使用寿命期间遵循的良好维护规范,许多道路即使在施工五年后也表现良好,其性能指标低于触发值,不需要覆盖。然而,特许协议不顾路面状况要求覆盖层,这是对自然资源的浪费。在此背景下,本研究以NH-22的安巴拉-昌迪加尔5年路段为例,研究了影响路面性能的各种参数。研究结果表明,所选路面经过5年的改造后,路面性能较好,不需要立即加铺。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investigations to assess the requirement of overlay every 5th year after initial construction on national highway projects: a case study
The maintenance schedule of the concession agreement made for construction of the National Highway projects in India under built operate transfer (BOT) Toll basis says that the pavement need to be overlaid whenever the performance indicators such as Roughness or Benkelman beam deflections (BBDs) exceed the trigger value or when the age of the pavement is more than five years. Due to improved quality in construction and good maintenance practices followed during service life, many roads are performing well even after five years of the construction and their performance indicators are below the trigger value and do not warrant for an overlay. Nevertheless, the concession agreements demand the overlay irrespective of the condition of pavement which is wastage of natural resources. With this background, in the present study, a five years road section from Ambala - Chandigarh of NH-22 was taken as a case study and studied various parameters which affect the pavement performance. Based on the study, it is concluded that the selected pavement for study is performing better ever after five years and overlay is not required immediately.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An analysis of consumer behaviour of green marketing Analysis of opportunities and challenges presented by big data in climate change research and its social impact Review of geopolymer concrete: a structural integrity evaluation Injury biomechanics in aircraft crash-landing reconstruction Multi-disciplinary approach to a use-of-force investigation: case study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1