具有返工过程和拍卖的多产品不完善生产系统的单机EPQ库存模型

A. H. Nobil, A. Taleizadeh
{"title":"具有返工过程和拍卖的多产品不完善生产系统的单机EPQ库存模型","authors":"A. H. Nobil, A. Taleizadeh","doi":"10.1080/2287108X.2016.1207975","DOIUrl":null,"url":null,"abstract":"In this paper, a multi-product Economic Production Quantity (EPQ) inventory model for a defective production system by a single machine is considered. The faulty produced products are reworked or are put on auction as they are. The aim of this research is to determine the optimal cycle length and the percentage of reworking every fault product such that the total inventory cost, including setup, production, holding, reworking, and lost profit, is minimized. We have proved that this problem is a convex non-linear programming method. Therefore, we came up with the exact algorithm based on differentiation to solve it. Finally, a sensitivity analysis is performed to evaluate the effect of changes in different parameters of the problem.","PeriodicalId":276731,"journal":{"name":"International Journal of Advanced Logistics","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"24","resultStr":"{\"title\":\"A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction\",\"authors\":\"A. H. Nobil, A. Taleizadeh\",\"doi\":\"10.1080/2287108X.2016.1207975\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a multi-product Economic Production Quantity (EPQ) inventory model for a defective production system by a single machine is considered. The faulty produced products are reworked or are put on auction as they are. The aim of this research is to determine the optimal cycle length and the percentage of reworking every fault product such that the total inventory cost, including setup, production, holding, reworking, and lost profit, is minimized. We have proved that this problem is a convex non-linear programming method. Therefore, we came up with the exact algorithm based on differentiation to solve it. Finally, a sensitivity analysis is performed to evaluate the effect of changes in different parameters of the problem.\",\"PeriodicalId\":276731,\"journal\":{\"name\":\"International Journal of Advanced Logistics\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"24\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Advanced Logistics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/2287108X.2016.1207975\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced Logistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/2287108X.2016.1207975","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24

摘要

本文研究了单设备缺陷生产系统的多产品经济生产数量(EPQ)库存模型。对生产出来的有缺陷的产品进行返工或按原样拍卖。本研究的目的是确定每个故障产品的最佳周期长度和返工百分比,从而使总库存成本(包括安装,生产,持有,返工和利润损失)最小化。证明了该问题是一个凸非线性规划方法。因此,我们提出了基于微分的精确算法来解决这个问题。最后,进行敏感性分析,评价不同参数变化对问题的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction
In this paper, a multi-product Economic Production Quantity (EPQ) inventory model for a defective production system by a single machine is considered. The faulty produced products are reworked or are put on auction as they are. The aim of this research is to determine the optimal cycle length and the percentage of reworking every fault product such that the total inventory cost, including setup, production, holding, reworking, and lost profit, is minimized. We have proved that this problem is a convex non-linear programming method. Therefore, we came up with the exact algorithm based on differentiation to solve it. Finally, a sensitivity analysis is performed to evaluate the effect of changes in different parameters of the problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fishing-industrial logistics – a special trend in logistics Design and performance evaluation of a healthcare distribution network towards maintaining a direct-to-customer policy Parallel military supply chain for resilience Proposal of a proactive logistics platform piloted by the product Simultaneous production planning of make-to-order (MTO) and make-to-stock (MTS) products using simulation optimization. Case study: Soren Restaurant
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1