保护供水系统(SPAM)项目投资可行性研究分析

F. Rahmawati, Sugeng Sulistiono, Fita Setiati
{"title":"保护供水系统(SPAM)项目投资可行性研究分析","authors":"F. Rahmawati, Sugeng Sulistiono, Fita Setiati","doi":"10.2991/aebmr.k.210717.028","DOIUrl":null,"url":null,"abstract":"The objective of this study is to determine the feasibility of an investment in a drinking water supply system (SPAM) project in Gresik. Investment feasibility research is research into whether or not an investment project is feasible. The methodology used in this study there are three methods, namely: (1) Net Present Value (NPV) method, (2) Internal Rate of Return (IRR) method, and (3) Payback Period (PP) method. The results of the analysis of the feasibility study using the WACC. The calculation result of the Net Present Value (NPV) is positive and the value of the Internal Rate of Return (IRR) is greater than the WACC, so that the Drinking Water Supply System (SPAM) Project is declared feasible. The Payback Period for the investment using the Payback Period method is also feasible in terms of return on capital. Keywords—analysis of project feasibility studies, investment","PeriodicalId":433214,"journal":{"name":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","volume":"111 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investment Feasibility Study Analysis on the Protected Water Supply System (SPAM) Project\",\"authors\":\"F. Rahmawati, Sugeng Sulistiono, Fita Setiati\",\"doi\":\"10.2991/aebmr.k.210717.028\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this study is to determine the feasibility of an investment in a drinking water supply system (SPAM) project in Gresik. Investment feasibility research is research into whether or not an investment project is feasible. The methodology used in this study there are three methods, namely: (1) Net Present Value (NPV) method, (2) Internal Rate of Return (IRR) method, and (3) Payback Period (PP) method. The results of the analysis of the feasibility study using the WACC. The calculation result of the Net Present Value (NPV) is positive and the value of the Internal Rate of Return (IRR) is greater than the WACC, so that the Drinking Water Supply System (SPAM) Project is declared feasible. The Payback Period for the investment using the Payback Period method is also feasible in terms of return on capital. Keywords—analysis of project feasibility studies, investment\",\"PeriodicalId\":433214,\"journal\":{\"name\":\"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)\",\"volume\":\"111 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/aebmr.k.210717.028\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 2nd Annual Management, Business and Economic Conference (AMBEC 2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/aebmr.k.210717.028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是确定在Gresik投资饮用水供应系统(SPAM)项目的可行性。投资可行性研究是对投资项目是否可行的研究。本研究采用的方法有三种,即:(1)净现值(NPV)法,(2)内部收益率(IRR)法,(3)投资回收期(PP)法。分析了应用WACC进行可行性研究的结果。净现值(NPV)的计算结果为正值,内部收益率(IRR)的计算结果大于WACC的计算结果,表明该项目是可行的。采用回收期法对投资的回收期在资本回报率方面也是可行的。关键词:项目可行性分析,投资
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investment Feasibility Study Analysis on the Protected Water Supply System (SPAM) Project
The objective of this study is to determine the feasibility of an investment in a drinking water supply system (SPAM) project in Gresik. Investment feasibility research is research into whether or not an investment project is feasible. The methodology used in this study there are three methods, namely: (1) Net Present Value (NPV) method, (2) Internal Rate of Return (IRR) method, and (3) Payback Period (PP) method. The results of the analysis of the feasibility study using the WACC. The calculation result of the Net Present Value (NPV) is positive and the value of the Internal Rate of Return (IRR) is greater than the WACC, so that the Drinking Water Supply System (SPAM) Project is declared feasible. The Payback Period for the investment using the Payback Period method is also feasible in terms of return on capital. Keywords—analysis of project feasibility studies, investment
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Financial Analysis to Predict Financial Distress of Small and Medium-Sized Entities in Malang City Meaningful Learning: Improving Students’ Accounting Knowledge and Skills Through Learning Computer Accounting Practice Courses The Effect of Earning Management on Level of Stickiness Cost in Registered Consumer Goods Industry Sector Companies on the Indonesia Stock Exchange 2016-2018 Accounting Treatment for Cryptocurrency Mediating Role of Good Corporate Governance to Intellectual Capital and Firm Value
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1