{"title":"利用超级电容器降低采矿变流器的能量预算","authors":"D. Das, J. Mazumdar, W. Koellner","doi":"10.1109/ENERGY.2008.4781066","DOIUrl":null,"url":null,"abstract":"A typical mining facility uses excavation machines like shovels, draglines etc. for removing overburden and ores during the mining process. These machines are characterized by cyclic loads consisting of high peak power demands as well as regenerative energy. The peak power demand is often as high as double the average demand. The regenerated energy is as high as 60% of the peak motoring power. This regenerated energy can be stored temporarily and then reused during peak motoring demand thus leading to peak-shaving of the load. The recent development in the field of ultracapacitors has led to commercial availability of high power ultracapacitor modules rated for reasonably high voltages. The paper proposes the use of ultracapacitors in order to peak load shaving thereby reducing energy costs. The paper also discusses the economic benefits achieved by adopting this technology.","PeriodicalId":240093,"journal":{"name":"2008 IEEE Energy 2030 Conference","volume":"326 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Energy Budget Reduction by Using Ultracapacitors in Mining Converters\",\"authors\":\"D. Das, J. Mazumdar, W. Koellner\",\"doi\":\"10.1109/ENERGY.2008.4781066\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A typical mining facility uses excavation machines like shovels, draglines etc. for removing overburden and ores during the mining process. These machines are characterized by cyclic loads consisting of high peak power demands as well as regenerative energy. The peak power demand is often as high as double the average demand. The regenerated energy is as high as 60% of the peak motoring power. This regenerated energy can be stored temporarily and then reused during peak motoring demand thus leading to peak-shaving of the load. The recent development in the field of ultracapacitors has led to commercial availability of high power ultracapacitor modules rated for reasonably high voltages. The paper proposes the use of ultracapacitors in order to peak load shaving thereby reducing energy costs. The paper also discusses the economic benefits achieved by adopting this technology.\",\"PeriodicalId\":240093,\"journal\":{\"name\":\"2008 IEEE Energy 2030 Conference\",\"volume\":\"326 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 IEEE Energy 2030 Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ENERGY.2008.4781066\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE Energy 2030 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGY.2008.4781066","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

在采矿过程中,典型的采矿设施使用铲子、拖绳等挖掘机器来清除覆盖层和矿石。这些机器的特点是由高峰值功率需求和可再生能源组成的循环负荷。高峰电力需求往往高达平均需求的两倍。可再生能源高达峰值动力的60%。这种再生的能量可以暂时储存起来,然后在高峰汽车需求期间重新使用,从而导致负载的削峰。最近在超级电容器领域的发展已经导致了高功率超级电容器模块的商用,额定电压相当高。本文提出使用超级电容器来削峰,从而降低能源成本。文中还讨论了采用该技术所取得的经济效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Energy Budget Reduction by Using Ultracapacitors in Mining Converters
A typical mining facility uses excavation machines like shovels, draglines etc. for removing overburden and ores during the mining process. These machines are characterized by cyclic loads consisting of high peak power demands as well as regenerative energy. The peak power demand is often as high as double the average demand. The regenerated energy is as high as 60% of the peak motoring power. This regenerated energy can be stored temporarily and then reused during peak motoring demand thus leading to peak-shaving of the load. The recent development in the field of ultracapacitors has led to commercial availability of high power ultracapacitor modules rated for reasonably high voltages. The paper proposes the use of ultracapacitors in order to peak load shaving thereby reducing energy costs. The paper also discusses the economic benefits achieved by adopting this technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Framework for Evaluation of Energy Policy Proposals Network reliability assessment towards long term planning AC Grid with Embedded VSC-HVDC for Secure and Efficient Power Delivery Control Strategies for Battery/Supercapacitor Hybrid Energy Storage Systems Power Electronics, a Key Technology for Energy Efficiency and Renewables
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1